Construction of CC road and drain in village limits of Bevinakuppe, Bhanaghatta, Dinka Shettihalli, Baby, Hosayaraganahalli, Ingalaguppe, T. S Chatra, K.Hosuru, Kerethonnuru, Chandre, Tirumalapura and Pattanagere in Pandavapura taluk, Mandya district
Steel Fabrication
Package-I Construction of Pipe Culvert in Km No. 4 and Km No. 7 of Kudachi Dy, Construction of Box culvert along combined structure in Ch 9.800 of Chinchali main canal connecting to offtake of Suttatti Dy & Construction of Bridge at Ch 12.200 (Near Karlatti Farm) of Chikkud branch canal and other works.
Steel Fabrication : Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping...
Complete Repairing of 150KW, 6.6kV Marathan make FLP HT motor Under Khottadih Colliery, Pandaveswar Area
Material Cost for fabrication of bearing housing of motor after making pattern, MS casting and maching as per the original size.
Repairing, rectification and full overhauling with spares of 03 nos. 500 GPM pumps assembly of Tapin open cast Project, Hazaribagh Area.
New fabrication of shaft with material EN-08 steel, machining and finishing key slot, key making on lathe as standard size/casting & machining impeller as per standard size and fitting
Maintenance/ repairing/ dismantling/ lying of 8 inch and 10 inch dia 2 ranges pipe line installed at mine for dewatering purpose and pump-motor set shifting for monsoon preparation at PEOCP under Hazaribagh Area.
Making /Fabrication of 6" dia tapper/bend
Manufacturing, Supply, Installation, Testing and Commissioning of Signage and Graphics for 14 Nos. of Elevated st. and 01 No. Depot of Corridor-02 of AGMRP and 5 No. of Elevated St., 03 Nos. of Underground St. and 01 No. Depot of Corridor-02 of KMRP
Support Structure: Support structure is to be MS section as approved by engineer-in- charge, suitably designed to support signage with all the relavant loading on station floor levels. The support structure is to be bolted/welded with base plate to the floor. Item to include all operations from fabrication to installation including powder coating of all mild steel section & channel in specified colour as per drawing.