Loading…
Loading…
10,188 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Calibration and repairing of automatic oil BDV testing kit at 220/132 KV S/Ss under ETD DHAMPUR; Calibration and repairing of automatic oil BDV testing kit at 220/132 KV..
and Installation of Plant Systems/Equipments (Version 2) - Calibration and repairing of automatic oil BDV testing kit at 220/132 KV S/Ss under ETD DHAMPUR; Calibration and repairing of automatic oil BDV testing kit at 220/132 KV..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Overhauling of Condensate Extraction Pumps WEIR MAKE and Hydraulic Coupling VOITH MAKE for unit 2 of 3x210 MW ATPS Anpara; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Overhauling of Condensate Extraction Pumps WEIR MAKE and Hydraulic Coupling VOITH MAKE for unit 2 of 3x210 MW ATPS Anpara; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Pest Control and Anti-termite treatment of various buildings of 1x660 MW Unit of Harduaganj Thermal Power Project, Kasimpur, Aligarh; Service Provider
Aligarh; Service Provider
REPAIR / REPLACEMENT AND MAINTENANCE OF HT SWITCH GEARS, HT DISTRIBUTION SYSTEM, 2/4 POLE STRUCTURE, EARTHINGS AT 2TB, 4TB, KOWKOOR, BEPTA AND CERTAIN LOCATIONS UNDER AGE E/M NO-1 OF GE(U) SECUNDERABAD.
S&F in repaire/ replacement of Air break switch rocking type Gang operated triple pole mechanically operated mounted on insulator and steel frame with operating mechanism worked from ground level for current rating up to 400 Amps suitable for 11000 volts complete all as specified and directed.
REPAIR MAINTENANCE OF INTERNAL WIRING FITTINGS AND FIXTURES DBS SUB MAIN WIRING AND ASSOCIATED WORKS AT MEGADHRIPETA PALLAVA PARK NAUSHAKTI VIHAR MOV OLD SITE AND ADJOINING AREA UNDER AGE EM AT GE ND VISAKHAPATNAM
In case of any delay in responding/ attending the repairs within 48 hours, the GE may at his absolute discretion impose penalty on the contractor at Rs 100/- per day per each work upto 05 (Five) days and Rs 200/- per day there after ...
Day-to-day Repair /maintenance of existing PHE Pipe network in Channi Himmat Section, Thanger and adjoining area Ward No 50, 51 and Deeli Section , Mattoo Colony sectionof Jal Shakti PHE Sub Division Narwal
Earth work in bulk excavation by mannual means over areas (exceeding 30 cm in depth and 11.50 Metered as well as 10 Sqm on Plant) including didisposal of excavated eath lead upto 50 M and lift uptio 1.5 M , as diirected by the Engineer in charge All kind of soil.