Loading…
Loading…
10,190 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; REPAIRING OF SPINDLE AMPLIFIER MODULE, (REPAIR OF POWER PCB AND REPLACEMENT OF CONTROL PCB), TYPE- A06B-6102-H211#H520 MAKE-FANUC; NA, and ... Unit; REPAIR ING ... ( REPAIR OF ... ( REPAIR OF ... Unit; REPAIR ING ... ( REPAIR OF ... ( REPAIR OF ...
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; REPAIRING OF SPINDLE AMPLIFIER MODULE
Manning Operation Maintenance and Repairs of Common Facilities and Services provided at MULT
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ARRESTING OF OIL LEAKAGES BY REPLACEMENT OF GASKET AND REPLACEMENT OF AIR CELL IN 100MVA TRANSFORMERS UNDER NORTH DIVISION OF OMI; ARRESTING OF OIL LEAKAGES BY REPLACEME..
REPAIR/MAINTENANCE TO LT PANELS, FEEDER PILLAR BOXES, EARTHING, DG SETS, AMF PANELS, OHT RESERVOIR, UG SUMP, RISING MAIN DISTRIBUTION AND OTHER E/M WORKS AT AF STN NARAINA UNDER AOR OF GE (AF) FARIDABAD
Material and labour for "lifting and Lowering of any capacity" Submersible Pump Set of capacity 7.5 HP for repair/ Overhauling /rewinding /devolpment incl increasing the length of delivery pipe/or any ...
Repair and Maintenance of Infrastructure Assets in R-IV Division during 2026-27. Sub Head - Providing DQ stone speed breaker, Signage board etc at Dr. Radha Krishan Marg under Sub-Division-I, R-IV Division.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Supply and installation of 230kV 160kN 3500mm long rod composite insulators on 230kV overhead transmission line and 230kV GIS switchyard gantry at PFBR B..