Loading…
Loading…
9,093 results • Best match
Custom Bid for Services - AMC of IT Eqpt For the year 2026- 27 at AGE(I) AF STN Amritsar Similar Category Annual Maintenance Service - Desktops, Laptops and Peripherals
Custom Bid for Services - AMC of IT Eqpt For the year 2026- 27 at AGE(I) AF STN Amritsar Similar Category Annual Maintenance Service - Desktops
Stage Contract for Annual Repair and maintenance of Rajal Lift Irrigation scheme from RD 12575 to 19500 and its distribution network.
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Stage Contract for Annual Repair and maintenance of Rajal Lift Irrigation scheme from RD 3600 to 12575 and its distribution network.
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
COMPREHENSIVE MAINTENANCE CONTRACT IN ANNUAL MAINTENANCE/ OPERATION/ REPAIR / INSPECTION & SECURITY OF STREET LIGHT, HIGH MAST, TRAFFIC SIGNAL AND C.C.T.V. MAINTENANCE WORK AT ATAL EXPRESS WAY ROAD RAIPUR FROM RAILWAY STATION-TELIBANDHA- NH-30 UNDER P.W.D. E/M. WORKSHOP SUB DIVISION RAIPUR ( C.G.)
Comprehensive Annual Maintenance Contract (CAMC) for a period of two (02.00) years, covering day-to-day repair and maintenance works at Kalyani Colony and Turio Colony under SDOCM of Dhori Area
Deployment of Facility Manager for heading the entire team and single point of contact & overall incharge of FM on site operators and reporting to Engineer-in- charge or his representative. (Note: Facility Manager is to be deployed on monthly basis only)
Running Maintenance , Operation of Electrical Mechanical Services, Pump Set, DG Set , Passenger Lift installed at College of Art, Tilak Marg, New Delhi (SH- Comprehensive Maintenance of 8 Passenger Aircon make Lift).
Comprehensive maintenance of 1 No. 8 Passenger (G+6 Floor) Aircon make Lift having 1 meter per second speed including overhauling, oiling, greasing, repairing and replacement of defective and worn out spare parts adjustment of components for machine to make it efficient, reliable & safe operating conditions as per terms and conditions attached. (a) For 1st Year