Loading…
Loading…
9,706 results • Best match
Day to day annual operation, repair and maintenance of Rising Main and Distribution System for different zones at Matherdighi (Part - A and C) W/S Scheme under Canning Sub Division of Alipore Division, PHE Dte. (For 365 days) (2nd Call)
Operation and Maintenance of distribution system and Rising main pipeline (CI/DI/AC/UPVC/HDPE) (For 365 days) including Opening & closing of all the different dia Sluice Valves (80 mm dia to 350 mm dia) on different places along the alignment of the rising main and distribution main at different places over the command area daily as and when required for regulating the supply of water and distributing' water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap / plug of wash out point or opening the sluice valves including de-jointing flange joints (80 mm to 350 mm dia) including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. [labour charges for operation and guarding of pump / valve/ disinfection arrangement with all accessories @ Rs. 487/ day / person + add bonus @ 8.33% i.e; Rs. 40.57 / day / person = total Rs. 527.57 + overhaed Expenses @ 5% i.e; Rs. 24.35+ Contractor's profit @ 10% i.e; Rs. 52.76 = Rs. 604.57 + ESIC contribution of employers @ 3.25% on labour charges i.e; Rs. 15.83 + EPF contribution of employers @ 13% on labour charges i.e; Rs. 63.31 = Total Rs. 683.81 say, Rs. 684.00 ] [N.B.: - i) Details scope of work and rates and measurement will be made as per Annexure - I ii) Any maintenance work carried out which is not included in the scop of work in Annexure-I (enclosed) may be done considering rates as per currend PHE / PWD SOR./SE/SWC] iii) The total amount inclusive of all duties and taxes. [For 365 days] Annexure - A
ROUTINE/PREVENTIVE MAINTENANCE TO DG SET FOR B CHECK AND C CHECK HELD UNDER GE BRICHGUNJ SRI VIJAYA PURAM
M & L for Inspection and carrying out B-Checks of 500 KVA DG Set Once in Six months or 250 Hours of Run whichever is earlier installed at various locations for the DG Set including inspection, maintenance, changing all types of filters and servicing of DG Set including Alternator, Non AMF / AMF Panels connected to DG Sets for routine check-up including routine / preventive maintenance checks, checking up of engine and alternator for the smooth functioning as per the Manufacturer’s instructions including checking of Engine Oil Level, Oil Bath Cleaner Oil Level, Draining Sediments from Fuel Tank, checking of Pre Cleaner Dust Pan, Air Cleaner Restriction, Coolant Level, Recording Oil Pressure, Checking / Tightening of all Bolts / Nuts of Engine and Alternator, checking of AVM Pads, Diaphragm Coupling, Air Piping, cleaning of Oil Bath Air Cleaner Tray Screen, check / adjust Belts, checking Battery Voltage, Water Level and apply Jelly on Terminals, checking Fan Hub / Air Blower Hub and Water Pumps, cleaning of electrical connections with CTC solution, checking of safety controls, cleaning of Cooling System, cleaning of Engine and Radiator Assembly, including cleaning of Air Filter using Pressure Air, Corrosion Inhibitor, O Ring, Gaskets, Screws etc. and draining out old engine oil from oil chamber and removing deposited material including applying Grease, CRC in moving parts and draining out water from radiator assembly and refilling new after mixing with coolant including tightening of all inlet and outlet connections and replacing minor items such as Hose Clamp, Screws, Washers etc., cleaning of Roof, Floor of the DG Set Room complete all as specified and as directed. Note: The B Check includes carrying out preventive maintenance including replacing minor unserviceable / worn out spares to keep the DG set for trouble free functioning. The rate quoted is deemed to be including all the minor spares such as screws, clips,washers, distilled water, electrolyte. All other spares will be measured and paid seperately as supply only under relevant items of this schedule, Contractor has to attend the break down at any time and place during the contract period. General maintenance is indicative only contractor has to carryout other necessary maintenance task also as required and directed by Engineer in Charge.
Biennial contract for Preventive maintenance of ABB Make LT VFD Drivemodules at FGD area of NTPC Solapur
VFD SYS (>) SERVICING
Facility Management Services - LumpSum Based - Agro waste; installation of Pine Needles Briquetting Unit; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Agro waste; installation of Pine Needles Briquetting Unit; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Hospitality; supply kitchen equipments at lump sump based; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Hospitality; supply kitchen equipments at lump sump based; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Industrial; Weigh Bridge Foundation/Tap/Hut Related Work; Cost of consumable to be reimbursed to service provider on actual
Facility Management Services - LumpSum Based - Industrial; Weigh Bridge Foundation/Tap/Hut Related Work; Cost of consumable to be reimbursed to service provider on actual