Loading…
Loading…
58,579 results • Best match
MAINTENANCE OF E&M SERVICES AT CSOI KG MARG NEW DLEHI SH- ANNUAL COMPREHENSIVE MAINTENANCE OF LG MAKE VRV/VRF AC SYSTEM AND VENTILATION SYSTEM
RMO of Centralized UPS system installed at Main Court Building at District Court Complex, Saket, New Delhi (SH Annual Comprehensive Maintenance of UPS system)
Annual comprehensive maintenance of following capacity Emerson Liebert make online UPS complete with all associated accessories and system etc. installed at administrative Block for keeping all the system always healthy and working condition without uninterrupted power supply etc. as required. (a) 4 Nos-80 KVA UPS (Total 320 KVA) Three phase input & Three phase out put
50(50)/2025-26/W
Day-to-day activities including pool cleaning, filter operation, chemical dosing, checking of residual chlorine, presence at general reception for card checking and collection, supervision of general operation and management of the facility such as cleaning of toilets, shower area, landscaping, requirement of plumbing and electrical and other minor repairs etc. and any other work required for smooth functioning of the facility.
Annual Maintenance of the E.I. Work at MCH bullding of Bankura Sammilani Medical C and H Annual Comprehensive Maintenance of All Single Phase and All type of Three Phase AC machines at MCH Buliding under B.E.Section-I,Gobindanagar Bankura.
A) Routine checking and servicing (Preventive maintenance). i) Checking & servicing of all mechanical & electrical parts of the A.C.Machine, refrigerant system, condenser & cooling system etc. three times in each month. ii) Checking of performance of each machine, Load Current (Amp) , CFM, grill temperature¸ room temperature etc. on daily basis & these shall be noted, in Log Book. All entries be countersigned by the Agency and the concerned Junior Engineer in the Log Book. iii) In every month, the Outdoor unit should be thoroughly cleaned and washed by vacuum cleaner and jet spray. iv) All machine shall be numbered according to their location, made and as per direction of E.I.C & Log book be maintained accordingly. v) Cleaning of filters twice in each month. vi) Lubricating the bearing of the motor & fan as and when required vii) Checking the electrical incomer upto incoming M.C.B incl. starter, switches etc. in each month. Any fault located should be brought to the notice of the Asstt. Engineer & Junior Engineer immediately. viii) Checking & repairing of all parts which have not been specified but necessary to keep the machine satisfactory running condition. ix) Agency must be provide a trained attender for operation of ductable type AC machine. x) If any fire hazard occurred due to poor maintenance of the Split/Window/ductable split Air Conditioning machine, the liability will goes to solely on the concerned maintenance agency.
Facility Management Service- Manpower based (Version 2) - Commercial; Stenographer; Skilled, Facility Management Service- Manpower based (Version 2) - Commercial; Clerk; Skilled, Facility Management Service- Manpower based (Version 2) - Commercial; Clerk; Unskilled
Facility Management Service- Manpower based (Version 2) - Commercial; Stenographer; Skilled
Facility Management Service- Manpower based (Version 2) - Residential; Housekeeping, Cook; Skilled, Facility Management Service- Manpower based (Version 2) - Industrial; Finance; Skilled, Facility Management Service- Manpower based (Version 2) - ... Semi-skilled, Facility Management ... Facility Management Service- ... Management Service - ...
Facility Management Service- Manpower based (Version 2) | Skill:Skilled | Billing:monthly | Amount:363091.17