Loading…
Loading…
4,139 results • Best match
Electrically operated Concrete breaker, CIV H HAMMER DRILL, Diamond coring machine for Concrete Core
GATE VALVE 1 2 1500 LBS IBR B16 34, GATE VALVE A 105 GR 3 4 1500, GATE VALVE A 105 GR 1 1500, VALVE GATE A216 GR WCB BW IBR 1500 11, VAL GAT THREADED RATING 1500 SIZE 2 I, GATE VALVE 1 2 1500 SW IBR, GATE VALVE 3 4 1500 SW IBR, RJ GATE VALVE SIZE 1 1500 CF8, GLOBE VALVE 1 2 INCH 1500, VALVE GLOBE A105 3 4X1500 SW, GLOBE VALVE 15MMX 1500 A105 IBR, GLOBE VLV A 105 GR 1 1 2 1500 IBR
Galvanized mild steel railing pipe, MS Flat 50x6mm (IS: 2062, 5/6m length, M S ANGLE 50X50X6MM, MS Angle 75x75x8mm (IS: 2062, 5/6m length
Worm Shaft suitable for Elecon Make Gearbox Type & Size: FSM-10.5", Ratio 30: 1 as per existing Sr. No, Set of Worm wheel with low speed shaft for Elecon make FSM-10.5", Ratio 30: 1 as per existing Sr. No, Worm Shaft suitable for Elecon Make Gearbox Type & Size: SNU-6", Ratio 20: 1, Worm Wheel suitable for Elecon Make Gearbox Type & Size: SNU-6", Ratio 20: 1 as per existing Sr. No. 1
E-rickshaw for Passengers (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6803720 Dated : 02-12-2025 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
GATE VALVE CS A105 G00722600002001013, GATE VALVE CS A105 SW G00720500025054003, VAL GT A105 G00720500049055004, GATE VALVE CS A105 G00720500051057003, GLOBE VALVE CS A105 G00722600002001036, GLOBE VALVE GL 5272 CS A105 G00720600050055003, GLOBE VALVE G00720600049057004, GATE VALVE G00720500060055001, VALVE GATE G00720500060054006, GATE VALVE G00720500060055003, GATE VALVE CS G00720600051001005, VALVE GATE G00720500060057006