Loading…
Loading…
992 results • Best match
Nitrogen Cylinder Capacity 50 Liter, working pressure 200 bar with pressure gauge
Description :Nitrogen Cylinder Capacity 50 Liter, working pressure 200 bar with pressure gauge fitted wit h fire rated Automatic fire suppression activation solenoid valve with manual override lever duly filled with nitrogen at 200+/- 10% bar for automatic fire suppression system conforming to RDSO spec No. RDSO/201 3/CG-06(Rev. Latest). Suitable to nitrogen cylinder fitted in automatic fire detection cum suppression syste m supplied by Sanrok Enterprises or JK Exim or similar in LHB power Car & Pantry Car coaches. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/BL/CW/PER, SR Tamil Nadu 6.00 Numbers
Supply of Sensing cum Actuation Device, with temperature
Description :Supply of Sensing cum Actuation Device, with temperature range of 68 to 72 degree C, Mode l no, TAD-IN. Make, Pyrogen, LHB AC AND SGAC Coaches, Pyrogen make Aerosol based fire detection & sup pression system., Review of Temperature Range issued by Railway board, RLY Board Letter Enclosed, Existi ng Bulb Thermal Actuator/Thermal head having Action Temperature as 68-72 Degree C to be replaced with respective OEMs. Note : OEM , Test, Guarantee , Warranty , Authorized Dealership certificate to accompany at the time of supply . Note : Released Sensing Actuation Divice Returned by firm . [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/AC COACHES/KCG, SCR Telangana 400.00 Numbers
AEROSOL239
Description :Supply and Installation of Aerosol fire detection & Suppression system cartridge minimum 10 gm as per Annexure G-1 of RDSO Specification No. RDSO/PE/SPEC/AC/0192-2018 (REV.1) & RDSO Letter No :EL/7.1.108/SBC/Main dated:06.08.25. All necessary modification, back pieces and accessories required for installation of this item shall be within the scope of supplier. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SE/E/TL/MUV/BSB, NER Uttar Pradesh 239.00 Set UVAM Item ref. ( Item Id :- 3100551 - Set of Panels for LHB EOG/HOG Garib Rath type AC coaches of Indian Railways ) Inspection Details Stage Inspection Not Required
Refilling of Nitrogen Gas Cylinder
Description :Refilling of Nitrogen Gas Cylinder-Capacity 50L, 200 BAR +/-10%, Scope of workk- Refilling of Nitrogen cylinder as per RDSO specification no RDSO/2013/CG-06(Rev-3) or latest with fire rated valve duly certified by PESO. Refilled cylinder with valves AND PRESSURE GAUGE will be provided and empty Nitrogen cylinder with fire rate valve will be taken back. ( inclusive of To & Fro transportation cost of Nitrogen cylind er ) for automatic fire detection and supression system of jk exim MINIMUM PESO VALIDITY 04 YEARS [ Wa rranty Period: 48 Months after the date of delivery ] ] Senior Section Engineer/Fur- Uttar Pradesh 5.00 Numbers Consignee I/Store, NER
SUPPLY OF DC TO DC CONVERTOR
Description :SUPPLY OF DC TO DC CONVERTOR (110 V to 24 V DC) AS PER JK EXIM PART NO JK-FSD-1120 FIRE/SMOKE DETECTION WITH ALARM SYSTEM AS PER RDSO SPECIFICATION NO RDSO/2008/CG-04, REV- 0
Prosense Relay Card
Description :Prosense Relay Card to Part No. JK-FSD-1125 for Automatic Fire/smoke Detection and Alarm S ystem in AC Coaches [ Warranty Period: 30 Months after the date of delivery ] ] SENIOR SECTION ENGINEER Madhya Pradesh 3.00 Numbers Consignee (C&W) INDORE, WR