Loading…
Loading…
227 results • Best match
SELECTION OF CONSULTANT FOR PROJECT MANAGEMENT CONSULTANCY (PMC) SERVICES INCLUDING DESIGN REVIEW AND CONSTRUCTION SUPERVISION FOR PMAY 2.0 URBAN HOUSING PROJECT AT VARIOUS PLACES FOR GUJARAT HOUSING BOARD.
1.3 Electrical, Mechanical and HVAC Installation works .
Request for proposal for Conservation and Restoration of Ghaziabad Municipal Corporation Towanhall, Ghaziabad
HVAC Split AC floor mounted AC installation: - Installation of split type wall mounted air conditioner indoor, outdoor unit fitted with rotary compressor, copper condenser and first charge refrigerant R410A, including connection of copper pipe and material supplied with complete unit etc as required. (excluding cost of copper pipe) 1.8 ton
Design, Engineering, Supply, Installation, Testing & Commissioning of (1) NEW LASER PROJECTORS (FOR 2D TECHNOLOGY) FULLDOME DIGITAL PLANETARIUM SYSTEM, (2) NEW 5.1 SOUND SYSTEM & (3) NEW 12.5 METER NANO SEAM POWDER COATED PERFORATED ALUMINIUM CO-CENTRIC DOME of Sardar Vallabhbhai Patel Planetarium (SVPP) at Sayajibaug with 10 Years of Comprehensive Operation & Maintenance (3rd Time Invite)
payable to Indian Agent): Comprehensive Renovation, HVAC, Electrical, Fire Safety,
CONSTRUCTION OF CONVENTION CENTRE AT IIM SHILLONG, SHILLONG MEGHALAYA
HVAC WORKS
CONSTRUCTION OF 176STUDENTS BOYS HOSTEL,160STUDENTS GIRLS HOSTEL,03 EXAMINATION HALL,STRONG ROOM,SKILL LAB.AND C.R.L.B UNDER EWS SCHEME IN THE PREMISES OF V.N GOVT.MEDICAL COLLEGE AT YAVATMAL IN MAHARASHTRA UNDER DMER DRUGS DEPART,GOVTOF MAHARASHTRA
HVAC WORKS
Composite Tender for Construction Works of Hyundai HTWO Innovation Centre
Passive Fire stop for HVAC shaft - Floor opening Supply and installation of Fire stop mortar CP 636 system with minimum 2 hours fire rating in services passing through fire rated partition of concrete, masonry, metal, gypsum partition when tested in accordance with UL 1479/ASTM-E 814 standards, after passing service lines like chiller water Pipes or Ducts. The mortar shall carry test certificate in accordance with IEC 60068-2-57:1999-11 (Environmental Testing) as per Part 2-57: Test for Vibration-Time-history method and VERTEQII for seismic zone 4. Acrylic fire stop sealant CP 606 with minimum 2 hours fire rating, shall be used along the periphery of ducts & chiller pipes without insulation. For penetrants with insulation, fire rated intumescent sealant to be used as per manufacturer recommendation. The products shall be age tested as per Dafstb and DIBT standards.