Loading…
Loading…
1,956 results • Best match
Cable Assy Control, Damper Rear Wheel, Cahain Sprocket Kit, Gear Lever Rep Kit, Relay Solid State, Ignition Relay Alt, Fuel Pump Motor, Blade Assy Wiper, Switch, Self Starter Clutch Assy, Light Switch, Pitiful Coil, Armature Tatra, Cable 3250 mm Tatra, Solenoid Switch TATA, Armature Army Bus, Disc Clutch Maruti, Bearing assy rear TATA Storm, Cable Assy Speedomenter Hero Honda, Starter Motor 24 Volts Army Bus
Fuel Pump Motor Maruti
Equipment
1. High Voltage Power Supply • Output: 0–40 kV, positive & negative polarity,• Digital control with current limiting and safety interlock 2. Syringe Pump System • Dual syringe pumps, upgradeable to triaxial (3) or four (4) syringe configuration • Flow rate range: 0.001–20 mL/hr,• Compatible syringe size: 1–60 mL 3. Spinneret System • Stainless steel needles (18G–30G) • Capability for single, coaxial and triaxial electrospinning, • Multi-needle spinning provision 4. Collector System • Interchangeable flat plate and rotating drum collectors (Different Sizes), • Drum speed: 0–5000 rpm • Adjustable tip-to-collector distance: 5–30 cm 5. Environmental Control Chamber • Fully enclosed electrospinning chamber, • Temperature control: Ambient–60 °C • Humidity control: 20–80% RH 6. Control & Automation • Touchscreen / PC-based operation, • Programmable process parameters • Real-time monitoring of voltage, flow rate, collector speed, temperature and humidity 7. Digital Interface & Data Handling • Advanced digital interface for system control,• High data storage capacity for experimental records • Data export through USB / Ethernet 8. Safety Features,• Fully grounded system • Door interlock for high-voltage safety • Emergency stop and overload protection 9. Accessories & Support • Syringes, needles, grounding cables and collector substrates, • On-site installation and user training,• Operation manual • Warranty: Minimum 2 year
Supplying Water Supply materials for Annual maintenance in Krishnarayapuram Town Panchayat from 01-07-2026 to 31-03-2027
FULL PUMP INDIA MARK II DEEP WELL HAND PUMP with 30 Meters (10 Nos. * 3 mtr) connecting rods with telescopic stand and cylinder assembly.
Supplying Water Supply materials for Annual maintenance in Punjaithottakurichi Town Panchayat from 01-07-2026 to 31-03-2027
FULL PUMP INDIA MARK II DEEP WELL HAND PUMP with 30 Meters (10 Nos. * 3 mtr) connecting rods with telescopic stand and cylinder assembly.
supplying Water Supply materials for Annual maintenance in Palayajeyankondacholapuram Town Panchayat from 01-07-2026 to 31-03-2027
FULL PUMP INDIA MARK II DEEP WELL HAND PUMP with 30 Meters (10 Nos. * 3 mtr) connecting rods with telescopic stand and cylinder assembly.
Supplying Water Supply materials for Annual maintenance in Nangavaram Town Panchayat from 01-07-2026 to 31-03-2027
FULL PUMP INDIA MARK II DEEP WELL HAND PUMP with 30 Meters (10 Nos. * 3 mtr) connecting rods with telescopic stand and cylinder assembly.