Loading…
Loading…
1,973 results • Best match
OBM ITEMS
OBM SP2 Fuel pump Part no 803529T04
BOQBOQ
Print Pump 3110 Print Pump Epson 3110
RATE CONTRACT OF MISCELLANEOUS ITEM FOR FINANCIAL YEAR 2026-27 AT GRAMPANCHAYAT GHOT TAH. CHAMORSHI
1 HP SUBMERCIBLE PUMP (AC)
Neonatal BP cuff with extension pipe for Multipara Monitor, Make: Ocean Healthcare, Model: Slim-50, Neonatal Spo2 Probe 1 cut 6 pin for Multipara Monitor, Protection Glass (with Touch) for Multipara Monitor, Make: Medoxy, Model: MPM-12, Power Supply ... Infusion Pump , ...
LV7 STLN P3713139 ARMATURE, LV7 MARUTI 12623M60A10 BEARING INPUT SHAFT, LV7 STLN P-4800808 WIRE ROPE WITH BOTH END SLINGS, LV7 STLN 2530- 018123 P-1007451 AIR COMPRESSOR REPAIR KIT, LV7 STLN VF F-7860600 CATCH ASSY HOOD, LV7 MARUTI 43461M75M00 NUT, ... 38410M66131 PUMP ASSY, ...
LV7 MARUTI 38410M66131 PUMP ASSY
Materails only for 80 mm bore GI tubing medium grade laid in trenches, Materails only for 50 mm bore GI tubing medium grade, Materails only for 40 mm bore GI tubing medium grade, Materails only for 25 mm bore GI tubing medium grade, Materails only ... various Pump Houses, ...
Manning and operation at various Pump Houses, installations of Zone 02 under EIC Etc. Manning and operation at various Pump Houses, installations of Zone 02 under EIC with the following manpower (a) 08 (Nine) Nos FGM Per Day (indlucing sunday and holidays) in 08 housrs shift. (b) 03 (Three) Nos Mate FGM (indlucing sunday and holidays) in 08 housrs shift.f Location and Timming of shifts will be decided by Engr in charge. Note (a) The FGM must be ITI quailifed in relevent trade/ 10 th pass with 03 to 05 years expereince in relvent trade. The Mate FGM must be10 th pass with 01 to 03 years expereince in relvent trade (b) The duty operator will also responsible of the following (i) Proper maintenance and cleaning in and out side area of pump houses/RO Plant /Borewell regularly as a presentable manner. (ii) A printed and properly binded regular attendance/log sheet must be maintained in respect of duty FGM by the contractor supervisors and produced to Engineer in Charge on demand. (iii) In case of non availability/absence of above FGM recovery will be effected double the minimum fair wages applicable for the relevant category or double the quoted rate whichever is higher. Complete all as specified and directed by Engineer In Charge.