Loading…
Loading…
869 results • Latest
Renovation Grid Synchronization and Operation and maintenance of Sapteshwar small Hydro Project (2x150 KW) in District Champawat (by deploying manpower with supply of material and consumables) for a period of three years
Complete overhauling/repairing of station transformer of capacity 250 KVA 0.415/11 KV by replacement of its Damaged & burnout parts and other related work including arrangement of skilled Technician & Labour ,special T&P etc. for proper completion of the work completion of the work as per direction of Engineer in-charge.
Renovation And Fire Safety System Installation At Mamlatdar office,Ranavav Dist:- Porbandar (Third Attempt)
1.0 Particulars: As per Above list of works
ARC FOR LAYING OF U/G CABLE (schemes & maintenance) WORKS FOR AKOTA SUB DIVISION OR ANY OTHER SUB DIVISION UNDER VISHWAMITRI WEST DIVISION.
along with satisfactory work completion certificate regarding execution of work from order
Construction of Multipurpose Community Hall at Therkku parambur Village in Ottapidaram Panchayat
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Providing and Laying Underground Sewerage Networks in Zones 13-5 and 14-3 and Constructing In-line Pumping Stations 13-5-1,14-3 1,14-3-2 and 14-3-3 at Thengaithittu and Ariyankuppam in Puducherry
Supply of all material, labour and T&P to provide, erect, dismantle and shifting of temporary barricading for particular work sites along trench during excavation and laying of pipe with Safeda ballies of 125 mm dia in horizontal section in three rows and vertical Casurina post of 150 mm dia at 2 m C/C fastened with coconut rope including provision of caution board. Unless approved or determined otherwise by the Engineer: Such temporary barricading shall be provided on both sides of open trenches. The unit rate shall refer to double-sided barricading of open trenches which shall be measured as per running metre (rmt) of open trench, whereas any single-sided barricading of open trenches shall be measured as per one-half of running metre (rmt) of open trench. The unit rate shall cover all costs for providing and erecting of temporary barricading from start of work at each particular work site until completion of work at each particular work site, as well as all costs to dismantle and shift the barricading to another particular work site. The barricading provided shall remain the property of the Contractor on completion of the work.
Providing and Laying Underground Sewerage Networks in Zones 13-Park and 14-2 and Constructing In-line Pumping Stations 13-Park- 6, 13-Park-1 and 14-2-1 at Nainar Mandapam and Murungapakkam in Puducherry
Supply of all material, labour and T&P to provide, erect, dismantle and shifting of temporary barricading for particular work sites along trench during excavation and laying of pipe with Safeda ballies of 125 mm dia in horizontal section in three rows and vertical Casurina post of 150 mm dia at 2 m C/C fastened with coconut rope including provision of caution board. Unless approved or determined otherwise by the Engineer: Such temporary barricading shall be provided on both sides of open trenches. The unit rate shall refer to double-sided barricading of open trenches which shall be measured as per running metre (rmt) of open trench, whereas any single-sided barricading of open trenches shall be measured as per one-half of running metre (rmt) of open trench. The unit rate shall cover all costs for providing and erecting of temporary barricading from start of work at each particular work site until completion of work at each particular work site, as well as all costs to dismantle and shift the barricading to another particular work site. The barricading provided shall remain the property of the Contractor on completion of the work.