Loading…
Loading…
3,383 results • Best match
Hose coupling for main compressor delivery as per ELS/VSKP Drg. No. ELS/VSKP/2019/12, Alt-A .
Description :Hose coupling for main compressor delivery as per ELS/VSKP Drg. No. ELS/VSKP/2019/12, Alt-A . [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ] Consignee SSE/ELE/DSL/ED, SR Tamil Nadu 30.00 Numbers
SET OF MACHINERY SPARES OF FANUC MAKE AS PER LIST ENCLOSED IN ANNEXURE-B
SET OF MACHINERY SPARES FOR SYSTEM
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF FEED MILL MACHINERY 500 KG PER HR AT Bhagai Foodgrains Producer Company Ltd KHERDA BHAGAI TQ BARSHITAKLI DIST AKOLA
SUPPLY, INSTALATION, TESTING &COMMISSIONING OF FEED MILL MACHINERY 500 KG /HR
M2/IAN-357SA PIPE P/GUAGE TRAILER CONTROL VALVE, M2/IAN-272SA PIPE REAR BRAKE CYLINDER INTER/REAR, M2/BOF-6149185 HOUSING SPRING, M2/BOF-6143493 BRACKET BREECH BLOCK ACTUATING SPRING (FOR RACK AMMUNITION), M2/BOF-5051417 PLUNGER SUSPENSION SPRING (AXLE FRONT)
M2/IAN-357SA PIPE P/GUAGE TRAILER CONTROL VALVE
3/4" (20 MM NB) GUN METAL GLOBE VALVE, " Y" TYPE STRAINER ASSEMBLY, DOUBLE TAKE CONNECTING FLANGE, KEY ACTUATED OXYGEN GAS CYLINDER VALVES
3/4" (20 MM NB) GUN METAL GLOBE VALVE
Expression of Interest for Establishing an Alliance with Suitable Partners For Development Manufacturing of Marine Valve in Partnership with GRSE for Defence Industry