Loading…
Loading…
3,405 results • Best match
Repairing works on corroded white liquor / black liquor tanks in CBP#2 and shell / bottom and inside shell plate of CBFL tanks at CBP#3 in Pulp Mill Mechanical at TNPL Unit 1
Providing Computer Operator, Assistant for Office Work and for HOusekeeping Manpower and Security Guard at Sub Division No. 3, Mechanical Sub Division, Sadar, Nagpur (3 months) (2nd call)
Custom Bid for Services - AMC for Preventive Breakdown Maintenance of Test Rigs and Equipment of Propeller Mechanical Electrical and Inverter Shop of Rotable Overhaul Similar Category Customized AMC/CMC for Pre-owned Products
Deep drilling of 125 mm dia bore hole and providing, installation, testing and commissioning of submersible pump motor set including allied electro-mechanical works at District Sheep Husbandry Office Udhampur of District Udhampur
Annual Maintenance of Desktop Computers, Photocopier, Printers peripherals installed at office of The Chief engineer, PIU, ROB, and office of The Superintending Engineer, Mechanical Circle, and offices of The Executive Engineer, N.H Planning Design
Custom Bid for Services - Hiring of Services for repair and restoration of Local Control Panel LCP, Atlas Copco HMI and instrumentation wiring of IG Compressor K1830 at APU Utility Area, ONGC Uran Plant Similar Category Repair and Overhauling Service ... And Maintenance Of ... Electro- Mechanical Installations ... Repair, Maintenance and ... of Plant Systems/Equipments
ONGC Uran Plant Similar Category Repair and Overhauling Service Operation And Maintenance Of Electro-Mechanical Installations Repair
Repairing of Pump-motor set, Panel, Outdoor lighting arrangement and other allied work at Alkusha OCP based pump house, under Asansol Mechanical Division, PHE Dte. Dist - Paschim Bardhaman.
Supply, delivery, installation and testing of 18KVAR APFC panel for improvement of power factor at Balapur Reservoir with necessary accessories under Electrical and Mechanical section, EAM Cell-IV of Operations and Maintenance Division-X
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Station Sikka; Work of Complete Servicing slash Overhauling of Boiler Feed Pump Type FK6D30 and Booster Pump Type FA1B56 of Unit No 3 and 4 during short sh..
TTPS Operation Circle O E I Units II and I Carrying out the shift operation works by assisting the AE JE shift in Boiler Turbine and Generator at control rooms for the period from 15.07.2026 for Unit II and 01.09.2026 for Unit I respectively or fro