Addition and alternation works with supply the webcum camera LED Signage board computer board etc in newly set up Sever Room and Conference room of 11th. Floor. WBIFMS Development Centre of Finance Deptt. at Subhanna Under Central Mechanical Div..
REPAIR/MAINT OF VARIOUS CAPACITY DG SET,WATER COOLER AND MECHANICAL CLEANING AND STERILIZATION OF VARIOUS SIZE OF OVERHEAD TANK,UNDERGROUND SUMP AND CONNECTED REPAIR WORK OF OHT AT OUTPOCKET MIL STN UNDER GE DINJAN NO.2
... existing size/section and fabricated structural steel such as angles, flat, ...
RMO of Electrical and Mechanical installations at Maharaja Aggresen College, Vasundhara Enclave, Delhi. During 2026-27 Sub Head Day to Day maintenance and Operation of E.I and Fans, Fire Fighting, Fire Alarm System, Lifts DG sets and Sub-Station
Supply, installation and commissioning of solar panel system including light & fan along with other electrical works in BVCM wagon as per RDSO drawing no. WD- 24050-S-07/sheet II with alt-3 or latest at Northern Railway Mechanical Workshop Amritsar.
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT, Mechanical, Statutory Inspection Testing and Certification of Pressure Vessels Pneumatic Air Pipelines and Lifting Equipment as per Scope of Work; Leak Testing F..
SUPPLY AND APPLICATION OF HOT AND COLD INSULATION ON ABOVE GROUND PIPELINE, VALVES, FLANGES, EQUIPMENTS ETC. FOR DIFFERENT AREAS IN CONNECTION WITH MECHANICAL WORK AT 5TH STREAM ALUMINA PLANT AT DAMANJODI, ODISHA ON SUB-CONTRACT BASIS.
Custom Bid for Services - DISMANTLING OF FOLLOWING EQUIPMENTS IS REQUIRED TO BE UNDERTAKEN FOR FURTHER SURVEY TO CGSD RADAR MAKE RAYTHEON ANSCHUTZ MODEL NSXUP AND GMDSS EQUIPMENT MAKE SAILOR THROUGH PAC FIRM M/S ELCOME INTEGRATED SYSTEM PVT LTD ... And Maintenance Of ... Electro- Mechanical Installations
... Similar Category Operation And Maintenance Of Electro-Mechanical Installations
Lot-II Package Hydro-mechanical Works for All Gates and Pressure Shaft Liners for the implementation of the 240 MW Uri-I Stage-II H.E Project, located near Boniyar, Uri villages in the Baramulla District of UT of J and K, India.
Work of Mechanical strengthening- Conductor, Hardware replacement of 66 KV D/C line on same tower (1) Sultanpur- Amalsad Line and (2) 66 KV Sultanpur- Abrama line from location no.9 to 19 under Navsari AM division.
Repairing and overhauling 5HP submersible pump of floating barge and replacement of damaged lighting luminaries of Cantilever bridge and pressure filter area and other allied work at Dalmia OCP W/S scheme under Asansol Mechanical Division,P.H.E Dte.