Loading…
Loading…
19,405 results • Best match
RMO Various Electrical and Mechanical Services at Various site Old age home , FOOD lab lawrence road,DM Office Rampura, Delhi (SH Fire safety and Water supply Pump work)
Rewinding, Servicing and overhauling of following size Submersible/Mono submersible/monoblock pumpset with copper rewinding wire, replacement of mechanical seals, sleeve shaft, O ring, ball bearings, cast iron impeller, delivery casing, water ...
Custom Bid for Services - Repairing supply and fitting of damaged spares of Main mechanical ventilation Fan at Rajur Incline Colliery of Ghonsa Sub Area Wani North Area Similar Category Repair, Maintenance, and Installation of Plant ... Repair, Maintenance and ... of Plant Systems/Equipments
Custom Bid for Services - CONDITION ASSESSMENT TRIAL OF PORT AND STBD DA FOR GRANT OF 4TH 5% (AGGREGATING TO 20%) EXTENSION OF RUNNING HOURS THROUGH PAC FIRM M/S GMMCO LTD VISAKHAPATNAMO Similar Category Operation And Maintenance Of ... Electro- Mechanical Installations
Custom Bid for Services - CONDITION ASSESSMENT TRIAL OF PORT AND STBD DA FOR GRANT OF 4TH 5% (AGGREGATING TO 20%) EXTENSION OF RUNNING HOURS THROUGH PAC FIRM M/S GMMCO LTD VISAKHAPATNAMO Similar Category Operation And Maintenance Of Electro-Mechanical Installations
MTPS I BM Lift Breakdown Maintenance and Overhauling replacement of worn out Electrical and Mechanical parts including the replacement of the defective electrical accessories travelling cables and main ropes etc of Boiler Lift II
Charges for Overhauling and attending the defects of Boiler Lift-II at MTPS-I including the replacement of the defective Electrical accessories, worn-out Mechanical parts, Travelling cables and Main ropes etc.,. (including cost of material) Make: Beacon, Model: V3F System, Capacity: 1360 KG /20 Passengers, Travel: Ground + 8 Floors, about 52 Mtrs., Rope: 13 mm x 6 falls
Repairing and maintenance of mechanical structures of 08 nos of road weigh bridges (05nos Static Road and 03nos of In-Motion Road) of Hingula OCP on as and when required for a period of 365 day.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Supply, delivery, fabrication, modification,installation,testing and commissioning of Electro-Mechanical equipments and instrumentation work at existing WTP for rejuvenation of 30 MGD Water supply scheme under Kalyani Municipality.