Loading…
Loading…
19,726 results • Best match
Routine Maintenance of 60 MT weigh bridge
Charges for routine maintenance of 60 MT weigh bridge (Mechanical & Electrical works) including inspection and cleaning of load cell chamber, cleaning of mud and ash under the platform and on ramp should be cleared then and there by loading, transporting and dumped at bottom ash (BA) silo area & ensuring free movement of weigh bridge, including T&P’s and consumables etc.,
OVERHAULING AND MAINTENANCE OF MAIN SEA AND DOCK FLOODING 1200MM AND 1800MM DIA BUTTERFLY VALVE (BFV) ALONG GEAR BOX WITH EXTENSION MECHANISM WITH CONNECTED ACCESSORIES FOR BFV NO 2A 3B 4B 5B 1B AND 2B FOR NORTH DRYDOCK (NDD) PUMP HOUSE DRYDOCKS NAVA
Overhauling and maintenance of Extension rod worm gear mechanism as follows: a) Overhaul the shaft and found any damages to on the surface of the shaft, to be metal buildup,... Replace the seals and O-rings and gaskets mandatory. d) If found any damage for external pipe of extension rod to be modified as site suited.
Selection of Concessionaire for Design Build Construction cluster 10 KLD FSTP based on fully Mechanized MBBR Technology and Operation and Maintenance for 3 years at Dergaon Town Ward No 01 under 15th FC Tied grant 2nd Instalment for the FY 2020-21
Sludge Drying Bed with fabricated MS roof structure
Custom Bid for Services - Hiring of OEM Services for Deputation of Engineer for Inspection/Troubleshooting Overhauling of Operating Mechanisms of Hitachi make Circuit Breakers at 765 kV Agra Substation on Rate Contract Basis Similar Category ... And Maintenance Of
Custom Bid for Services - Hiring of OEM Services for Deputation of Engineer for Inspection/Troubleshooting Overhauling of Operating Mechanisms of Hitachi make Circuit Breakers at 765 kV Agra Substation on Rate Contract Basis Similar Category Operation And Maintenance Of Substation
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; ANCHOR CABLE ROLLER DEFECT AND STBD ANCHOR CAPSTAN DRUM TO BE RECTIFIED, REPLACE OF BOOK SELF AT CAPTAIN CABIN, RENEW OF LOCKING MECHANISM OF BASCCA LOCKER..
and Installation of Plant Systems/Equipments (Version 2) - Office Space; ANCHOR CABLE ROLLER DEFECT AND STBD ANCHOR CAPSTAN DRUM TO BE RECTIFIED
Prepare a detailed survey, investigation and report for the conversion of the K. T. Weir on the Mula and Pravara rivers in Ahilyanagar district into mechanically operated vertical lift gates under special repair and for the necessary work, constructi
... conversion of the K. T. Weir on the Mula and Pravara rivers in Ahilyanagar district into mechanically operated vertical lift gates under special repair and for the necessary work, construction of flood protection walls and ghats along the banks of Pravara, Mula and ...