Loading…
Loading…
20,362 results • Best match
Deployment of staff at Jahangirpuri sewage trolley main hole no 1 and 2 AC 4
... (Morning & Evening) as per direction of engineer-in-charge by operating all electrical and mechanical equipment, minor maintenance i.e. filling of gland, greasing, replacement of coupling tyre, operation of UGR intake... of gland, greasing, replacement of coupling tyre, operation of UGR intake valve, minor maintenance in LT panel etc. & to maintain proper cleanliness of pump house by deploying of semi- ...
Deployment of staff for Maintaining water supply by deployment of staff various BPS at Sec 24 JJC Rohini and Shahbad Dairy BPS in AC 07
... on daily basis, as per direction of engineer-in-charge by operating all electrical and mechanical equipment, minor maintenance i.e. filling of gland, replacement of coupling tyre minor maintenance in LT panel etc. & to maintain proper cleanliness of pump house, by deploying of semi-skilled/trained ...
SWSN WORK NAGAR PALIKA RAISEN
Strengthening of Pipeline Network at nagar palika parishad area including sustaining of all pump house, pumping stations with solar inclusive all electro mechanical and civil work with complete testing
refer to BOQ
Carriage of Sand from Source to site of work by Mechanical transport including loading /Unloading complete for an avg dince of 150 km by MT & 500 mtr by H/L
Annual Maintenance estimate for water supply and Sewerage scheme in Auto Market, Hansi for the year 2025-26.
... for examine the possibilities for construction of 12.00 MLD Canal based Water Treatment Plant(WTP) instead of 6.00 MLD WTP (as per decision of the competent authority) in Hansi, Sector-3, ...
Construction of Retaining wall and drain behind S-II qtrs. BBMB colony under Chief Engineer(Gen) Sundernagar.
Excavation work by mechanical means (Hydraulic excavator)/ manual means infoundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including gettingout the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.:-Ordinary rock