Loading…
Loading…
20,576 results • Best match
Construction of Retaining wall at Rd. km. 2/940 to 2/950
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
R O rain damages MC road from PWD road Bharari to Mini kuftardhar in ward No 2 Ruldu Bhatta RD 0 00 to 0 495 Phase II SH C O R wall etc RD 0 480 to 0 495
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
C O R wall on ambulance road from Kuftadhar to Near Panchayat Ghar in ward No 2 Ruldu Bhatta RD 0 00 to 0 105 mtrs SH C O R wall P L C C 1 3 6 and R R Masonry etc RD 0 070 to 0 095 mtrs
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
C/O PCC B/wall between RD. 32/130 to 32/150 (Balance work)
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
Repair of Boundary wall of District Police Lines Rajouri
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
Upgradation of lane and drain street no 12 sec -6 and allied lanes in ward 43
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.