Loading…
Loading…
20,789 results • Best match
DWSS Works
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
As per SBD
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding ...
Balance work of Half Kilometer Motorable road from Jabri To Talab Kaller Dodasan Bala Link of Dodasan Bala road in upper Pyt Dodasan Bala Part II
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Permanent Restoration of road form Prhali to Katha to Azmtabad
Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete.
Doam Mukrana Road
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding ...
Major Repair of Girls High School Balhama.
Carriage of materials from source to site of work by mechanical means.