Loading…
Loading…
668 results • Best match
Construction of Syunsi Barrage across Eastern Nayar river in Block Bironkhal Distt.- Pauri Garhwal, Uttarakhand.
Supply and installation of Self driven rock anchor made of 40CR material with outer dia of 32 mm and inner dia of 18.5 mm, Yield Load carrying capecity of minimum 230 KN in soil/overburden/rock suitable for drilling, placing and cement grouting. Instalation with all accessories such as 51 mm dia drill bit, couplers, 10 mm thick base plate and nut & bolt complete in all respect but excluding the cost of cement grouting which will be paid extra as per relevant BOQ item.
CONSTRUCTION OF INTEGRATED SCHOOL COMPLEX BUILDING IN THE CORE URBAN RESION ECONOMY AT SY.NO. 354, SITUATED AT GAJULARAMARAM VILLAGE, QUTHBULLAPUR MANDAL, MEDCHAL MALKAJGIRI DISTRICT
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING
CONSTRUCTION OF INTEGRATED SCHOOL COMPLEX BUILDING IN THE CORE URBAN RESION ECONOMY AT SY.NO.25/2, PET BASHEERABAD, JEEDIMETLA, QUTHBULLAPUR MANDAL, MEDCHAL MALKAJGIRI DISTRICT
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING
CONSTRUCTION OF INTEGRATED SCHOOL COMPLEX BUILDING IN THE CORE URBAN RESION ECONOMY AT MURAHARIPALLY, SHAMIRPET MANDAL, MEDCHAL MALKAJGIRI DISTRICT
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand(with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING
Building Work
10000556 Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200cfm/300psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories,tools and plant and consumables etc for lowering of 200mm dia PVC pipes for housing fitted with socket and with or without well screen as per tenecessity for soft,medium,hard and boulder formation (PVC casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and with drawing after completion of the tube well).(Icluding both LABOUR FOR DRILLING 200MM DIA UPTO 30 MTR. & LABOUR FOR DRILLING 150MM DIA FROM 30 MTR TO 150 MTR including all.) CONSIDER FOR 150 MTR DEPTH. Ground Floor
INFRASTRUCTURE DEVELOPMENT OF GOVT. PRIMARY SCHOOL GARGADBAHAL, GOVT. U.P. SCHOOL SANKARAPOSH UNDER BARGAON BLOCK (2)
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the engineer in charge including use of own rig with its accessories ,tools and plant and consumables etc for lowering of 200mm/150mm dia G.I.P.V C/M.S casing pipes for housing fitted with socket and with or without well screen as for the necessity for soft ,medium,hard and boulder formation( G.I/P.V.C/M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well) 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only