Loading…
Loading…
550 results • Best match
Construction of Palabegunia to Chakajamalpur Road in the District of Balasore under MMSY for the year 2026-27
Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer-in-charge including dewatering if required.
Construction of H.L. Bridge over Dhankan Nallah at 1st Km on Turanipada near Tarini Mandir Nahanga Talamahuri road in the District of Balasore under SBY for 2026-27.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Construction of H.L. Bridge over river Kansabansa on Kundi to Sardanga road in the District of Balasore under SBY for 2026-27.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Construction of H.L. Bridge over Chelia Nallah at 1.40 Km (At Kathamunda) on Moudpur to Nidhibindha road in the District of Bhadrak under SBY for 2026-27.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Construction of Bridge over Dhankan Nallah at 3rd Km on Nachhipur Patra Sahi Palasa GP road in the District of Balasore under SBY for 2026-27.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
Regular Operation and Maintenance of Industrial area EPIP, Sitapura Ph I to IV, Institutional area, SEZ Ph I and II, Ramchandarpura, Prahladpura and residential colonies under unit office EPIP Sitapura, Jaipur.
Cleaning & upkeepment of RoW including jungle clearance & dressing of road sides:Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance & dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include : a) Cleaning/sweeping of road carriageway by mechanical/manual meansb) Clearing of jungle/vegetation from roadsides &lifting, removal and disposal of waste/dust/earth collected by cleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site.c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuring that proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there is no accumulation of water in RoW.d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in all respect as per the scope of work mentioned in Annexure-1 of RFP document and directions of EIC.Note: RoW to be cleaned on weekly basis.