Loading…
Loading…
2,009 results • Best match
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone boulders of size 15cm to 30 cm in length.in any direction, not less than 0.028 Cum in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing (as per Design and Drawing) including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, LabourCess, taxes ( excluding GST )of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift, handling and re-handling with cost of labour charges and other incidentals charges required to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer-in-Charge
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone boulders of size 15cm to 30 cm in length.in any direction, not less than 0.028 Cum in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing (as per Design and Drawing) including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, LabourCess, taxes ( excluding GST )of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift, handling and re-handling with cost of labour charges and other incidentals charges required to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer-in-Charge
Improvement to Right side service road of Chitrotpala Right Branch Canal from RD 0.75 km to 1.75 km for the year 2026-27. (MBD05/2026-27)
Quarrying, collecting, supplying and stacking of good quality of moorum in regular box heap size of (1.50 m x 1.50 m x 0.50 m ) to be measured as one cum and laying in both the flank of the embankment in layers not exceeding 100 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess including hire charges of T& P materials required for the work watering and consolidation with P.R.R to the required density and DMF+EMF+Addl. charge of materials, hire & running charges of machinery, cost of labour and cess but excluding GST etc. complete as per direction of Engineer-In-Charge.
Special Repair to E type Qtr at Brajrajnagar Section office new in the district of Jharsuguda for the year 2025-26
Painting Two coat over a coat with approved paint on new work with any approved paint on iron work including cost, conveyance, taxes of all materials and T&P required for the work etc. complete including cost of paint ( paint of approved quality will be supplied by the contractor at his own cost.) etc. complete as per direction by the Engineer-in-charge.
CC Lining of Disty. No.8 of Kendrapara Canal
Quarrying, collecting, supplying and stacking of good quality of moorum and sand in regular box heap size of 1.50m X 1.50m X 0.50m to be measured as one cum and admixing moorum and sand in (60:40) proportion and spreading in canal bed for CNS layers not exceeding 100 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess & all other taxes as applicable including hire charges of T&P materials required for the work , watering and consolidation with P.R.R. to the required density in OMC, hire and running charges of machineries of PRR etc. complete as per specification and direction of the Engineer-in-Charge.
Canal improvement
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).