Loading…
Loading…
2,019 results • Best match
Improvement to Left side service road of Paika Left Branch Canal from RD15.00 km. to 15.77 km. for the year 2026-27. (MBD03/2026-27)
Quarrying, collecting, supplying and stacking of good quality of moorum in regular box heap size of (1.50 m x 1.50 m x 0.50 m ) to be measured as one cum and laying in both the flank of the embankment in layers not exceeding 100 mm thick with all leads, lifts and delifts including cost, conveyance, royalty, cess including hire charges of T& P materials required for the work watering and consolidation with P.R.R to the required density and DMF+EMF+Addl. charge of materials, hire & running charges of machinery, cost of labour and cess but excluding GST etc. complete as per direction of Engineer-In-Charge.
Providing And Constructing KOLHAPUR Village Water Supply JJM Scheme Tq JAFRABAD Dist.Jalna
TRIAL BORE Item No.1 Taking Trial Bore by Calyxe machine with TCT/NX bits together undisturbed strata samples for investigation in all types of strata soft soil, murum, hard murum with boulders, soft rock hard rock & quartizite etc. The item includes all Hire & running cost of Callyx Machine conveying all materials to site of work excluding conveyance of callyx, machine and back sampling all over burden strata in glass jar and core samples serially numbered at site in a wooden Core Box, Samples to be taken at 1.0 m interval and conveying to the place as directed by Engineer-in-charge, The diameter of bore in overburden shall be 100 mm and of NX size (50mm) in other strata. The item shall also include M.S. casing pipe of 2.5 mm thick plate in overburdern only and shall be 1.0 m above GL with cap over it. In overburden(soft soil,murum)
Embankment protection
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
Embankment protection
Quarrying, collecting and supplying hard granite stone boulders of 15cm to 30cm in size, free from weathered skin surface and other deleterious materials dry packing for slope protection works in river embankments including surface packing in all heights and depths including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, labour cess transportation of all materials of approved quality with uniform colour and texture from approved quarry with all leads, lifts, delifts etc. and all other incidental charges with quality control tests required to complete the work as per specification and direction of the Engineer-in-Charge.
Embankment protection
Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less).
Operation and Maintenance of Industrial area Chopanki, Pathredi and Bandapur
Regular Cleaning and upkeeping of all ROW area of roads including sweeping of road carriageway, jungle clearance & dressing of roadsides by Mechanised/manual means with all T&P, labour etc. The scope of work shall include : a) Cleaning/sweeping of road carriageway by mechanical/manual means b) Clearing of jungle/vegetation from roadsides & lifting, removal and disposal of waste/dust/earth collected by cleaning/sweeping from roadside area (complete RoW) by engaging wheelbarrow / trolly as per requirement of site. c) Dressing of roadsides by mechanical/manual means & removal of unsuitable soil, overburden etc. complete ensuring that proper slope towards the storm water drain from road carpet as well as plot boundary is maintained so that there isno accumulation of water in RoW. d) Any other work related to maintaining cleanliness in RoW and as directed by engineer-in-charge complete in all respect as per the scope of work mentioned in technical bid document and directions of EIC.