Loading…
Loading…
2,034 results • Best match
Construction of Bridge over river Gogona Nallah on PWD road to Kendua road in the District of Balasore under SBY for 2025-26.
Providing Rough stone dry packing / pitching in slope, protection walls, approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying conveying and cost conveyance taxes royalty of all materials including complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level as per direction of the Engineer – in – charge including dewatering if required.
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone other than granite of size 15cm to 30 cm in length.in any direction, not less than 0.003 Cum in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing (as per Design and Drawing) including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, Labour Cess, taxes of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift, handling and re-handling with cost of labour charges and other incidentals charges required to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer-in-Charge .
CONSTRUCTION OF 2 NOS OF D TYPE TWIN NH STAFF QUARTER AT NH DIVISION SUNABEDA FOR THE YEAR 202526
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only
CONSTRUCTION OF 2 NOS OF E TYPE TWIN NH STAFF QUARTER AT NH DIVISION SUNABEDA FOR THE YEAR 202526
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only
CONSTRUCTION OF 2 NOS OF E TYPE TWIN NH STAFF QUARTER AT NH SUBDIVISION SUNABEDA FOR THE YEAR 202526
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only
Building type works
Sinking of tube well(200) for PIT Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only (A) Drilling of 200mm dia bore 00 mtr to 50mtr