Loading…
Loading…
2,032 results • Best match
Annual Maintenance Contract (AMC) for Shifting, Erection, and Dismantling of HT Overhead Line at West and Coal Sections of Dudhichua Project for a Period of 02 Years (730 Days)
Erection of pole top/straight two wire/V shape two wire angle iron/channel iron cross iron arm on wood/RCC/PCC/steel tublar/rail pole etc. as required
Renovation of Baridi MIP in Gunupur Block of Rayagada District under ERM Scheme for the year 2025-26
Providing and removing rigid and smooth centering and shuttering for CC/reinforced cement concrete works including false work and dismantling the same after casting and proper curing including cost, conveyance, royalty and taxes of all materials, supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-In-Charge.
NIT for Public Liability Insurance Policy for WBPDCL
PUBLIC LIABILITY (ACT ONLY) INSURANCE POLICY for all plants and coal mines of WBPDCL w.e.f 10.05.2026 to 09.05.2027
Improvement to Champikota MIP in Rayagada Block of Rayagada District under Infrastructure Development Fund (IDF) for the year 2025-26
Cement concrete M15 grade with 20 mm down grade crusher broken hard granite chips quarried & free from weathered skin of approved quality mixing by concrete mixer with all leads & lifts including hoisting, lowering and laying concrete in position to proper slope and level and compacting by Vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty,EMF, DMF, additional charge and other taxes of all materials supplying all labour and T&P required for the work etc. complete in all respect as directed by Engineer-in-charge.
Construction of Tikiri Check Dam near village Budugudari of Tikabali GP in Tikabali Block of Kandhamal District.
Providing & removing rigid smooth centering & shuttering for R.C.C./ C.C works including false work including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and proper curing including depositing the debris clear of work site with all leads & lifts delfts including supply of all labour and T & P required for the items etc. complete in all respect as directed by Engineer in charge.
Erection of New 33KV overhead line second feeder for feeding power from West sub-station to East sub-station and shielding/meshing of both 33KV feeder No. 1 and 2 overhead line by earthing wire from 132KV /33KV Nigahi Sub-Station to Coal sub-station,
Excavation of pole pit ( Pit size= 0.8x0.8x1.8 Mtrs) and erection of 13 to 16Mtr Tubular/rail pole with fixing of required brackets, support angles, clamps with nut-bolt, stay wire with stay insulators.(with concrete mixture 1 bag Cement/mine gravel /sand, suitable Nut-bolt supply by contractor at his on cost)