Loading…
Loading…
2,066 results • Best match
Providing irrigation faclilty to SCP Beneficiary Narsing s/o Manik of Amalapur village, Sunil s/o Bakkappa of Shekhapur village, Rajkumar s/o mareappa of Karkampalli village, Rukmini co Jnanadev of Sikandrapur village, Rajkumar s/o Ramshetty of Madargi, Lokesh s/o Suraj of Sirakatnalli village,Babu s/o Shivaram of Saatolli village, Sangram s/o gangu of Govinda thanda village, Vidyavati C/o Sunil of Honnadi, Chandramma c/o Daulappa of tadpalli village in Chitguppa, Bidar Taluka and District Bidar Others.
21 The contractor should obtain the Material Dispatch Permit for stone, aggregates, sand and Murom etc will be used in the construction work from the Mines and Geology department at the time of execution and same should be submitted along with the work bill, then for such work bills no Royalty will be deducted. If the contractor failed to submit the Material Dispatch Permit along with the work bill Five times Royalty will be deducted from the work bill as per KMMCR 2016 amendment rule 44(4) and the circular vide No.Ga.Bhu.E/DCB/DCB/Takte/2019-20/4497 Dated: 12/12/2019 by Mines and Geology department.
Providing irrigation faclilty to SCP Beneficiary Ravindra s/o Shankar sagar of Molkera village, Nagraj s/o Gundappa of Dubalgundi village. Rajanna s/o Manikappa of Gadvanti village, Pradeep s/o Maruti of Dakulgi village. Tukaram s/o Chandrappa of Hallikhed K village, Borabai C/o Bhoju of Shankru thanda village, Kamalabai c/o Parashuram of Kantu thanda village, Ramanabai c/o Pandurang of Handral village in Humnabad Tq Rserved for CAT II(A) CAtegory
21 The contractor should obtain the Material Dispatch Permit for stone, aggregates, sand and Murom etc will be used in the construction work from the Mines and Geology department at the time of execution and same should be submitted along with the work bill, then for such work bills no Royalty will be deducted. If the contractor failed to submit the Material Dispatch Permit along with the work bill Five times Royalty will be deducted from the work bill as per KMMCR 2016 amendment rule 44(4) and the circular vide No.Ga.Bhu.E/DCB/DCB/Takte/2019-20/4497 Dated: 12/12/2019 by Mines and Geology department.
Underground construction of 13 nos. of RCC Isolation stoppings at Mine No.-4, Orient Area, MCL. (TOP Sec and Bottom Sec)
Carriage of cement plastering materials (only sand for storage at sites) from Incline mouth to U/g. mine track end/buffer including loading in mine car at Incline mouth, walking along the car inside the mine, rehandling in case of de-railment of the cars, unloading and stacking the materials at destination including taking the empty cars from U/g. mine to the Incline mouth.
Flood Protection to Porpotta Nallah near village Mandiapura of Bamra Block under Sambalpur District for the year 2025-26.
Earth work in excavation of foundation in all kinds of soil including hard moorum,stoney earth mixed with boulder (except sheet rock and boulder required blasting)with all lead ,lifts and delifts including dressing and levelling the bed & slope & depositing the excavated materials at places away from the work site with all leads,lifts and delifts including cost of all labour & dewatering if required and T&P required for the work etc.Complete as directed by the Engineer-in-charge.
Construction of Ambgaon Kumbhargadia-I Check Dam over Local Nalla Near village Kumbhargadia in Barkote Block of Deogarh District under Maty Scheme
Providing cement concrete M15 grade with 20mm size and down graded crusher broken hard granite ccoarse aggregate quarried& free fom weather skin surface and other deletorious materials,quarry debrish of approved quality clean and sharp sand of approved grading & quality conforming to design specification mixing by concrete mixture including hoisting lowering and laying the concrete in position to proper slope and level and compacting with vibratior in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period providing beads and grooves and cost,conveyance,royalty of al materials,labour,T&P Materials required for this item including hire and running charges of the machineries,workers welfare cess etc.complete excluding GST in all respect as directed by the engineer-in charge.
Flood Protection to right side of Podpatta Nallah near village Ulunda adjacent to Shiva Temple of Kuchinda under District Sambalpur for the year 2025-26.
Earth work in excavation of foundation in all kinds of soil including hard moorum,stoney earth mixed with boulder (except sheet rock and boulder required blasting)with all lead ,lifts and delifts including dressing and levelling the bed & slope & depositing the excavated materials at places away from the work site with all leads,lifts and delifts including cost of all labour & dewatering if required and T&P required for the work etc.Complete as directed by the Engineer-in-charge.