Loading…
Loading…
489 results • Best match
Selection of agency for laying of 24F OFC in the APSFL Phase-1 Network
Supply, Installation, Trenching/HDD/Clamping, Laying of Duct, Blowing of OFC through Ducts, Splicing, Testing & Commissioning for OFC shifting work against Railway Track Doubling in the Luni-Samdari-Bhildi section of the JU Division
Permanently Lubricated HDPE Telecom duct to use as U/G Optical fibre cable conduits size 40/33 mm and accessories as per TEC Specs No. TEC/GR/FA/CDS-008/04/AUG-19 with latest amendment for RailTel Optic Fiber Network. As per Section-II,Chapter-7,clause-4.
Provision of Electric Power Fence, Perimeter Light, Optical Fiber based Perimeter Intrusion Detection System (PIDS) and CCTV Surveillance System with VMS in Parliament House Complex, New Delhi (SH : Construction of office cabin in Room No. FB-059 of Parliament Library Building).
Portable Digital Processing & Secure Administrative Computing Unit, Managed Network Distribution & Power Delivery Unit, High Bandwidth Ethernet Transmission Medium, Surveillance Device Installation Enclosure, Retina Pattern Authentication Terminal, ... Device, Optical Fibre ... Optical Fibre Cable ... Fibre Cable for ...
Optical Fibre Cable for Networking
Replacement of patches of OFC (48F) by laying of PLB HDPE Duct and armored OFC including all protective materials and commissioning of the links by integrating with the existing OFC including mid-section splicing and termination at repeaters from Pal
Replacement of patches of OFC (48F) by laying of PLB HDPE Duct and armored OFC including all protective materials and commissioning of the links by integrating with the existing OFC including mid-section splicing and termination at repeaters from Sri