Loading…
Loading…
496 results • Best match
RENOVATION OF GUEST HOUSE AT GAIL ALAYA MINOR RENOVATION and SPACE OPTIMIZATION OF GAIL BHAWAN AND EXTERNAL DEVELOPMENTAL WORKS AT GAIL ASHIYANA
Supply, Installation, testing and commissioning of 24 port Cat 6A 19" Modular Toolless Patch Panel (loaded) enable all possible combinations of the various types of cable. mounted on the same panel by using various toolless connector blocks/modules. Have a metal structure enabling them to be durably fixed to the uprights of the 19” chassis and assuring automatic grounding between toolless RJ-45 connectors, the panel, and the 19” uprights of the enclosure. Include rear cable support with plastic cable guides to hold cable without need for cable ties. Include quick mounting system to mount the panel into the 19” rails without use of cage-nuts. Front Removal IO's option for maintenance and trouble shooting with 6 Different Colours Labels for Labelling & Identification of Individual Ports. Tested and guaranteed under dual circuit IEEE PoE+ up to 50W for up to 2500 on-load connections / disconnections.
Building Work
40010432 LED Display Board 4' length X 1 height. Outdoor P 10 pixel,colour red, package SMD 3535,Pixel Pitch 10mm, Pixel configuration SMD3535 Black, Density 10 ,000 pixels/m (real pixel), Module Resolution 32pixel(L) * 16pixel(H), Module Dimension 320mm(L) • 160mm(H) *25mm(D),Driving Mode Constant current, 1/4 duty Module Mask Pure black mask--high contrast screen, Brightness 26,000 cd/m, Viewing Angle 120° (Horizontal); 120°(Vertical, Best Viewing Distance 210m Gray Grade 16,384 levels for each color, Display Color 4.39 Trillion Colors Brightness Adjustment 100 grades by software or automatically by sensor, Max. Power Consumption 28W,Correction Scale Level 12bits Frame Frequency 260Hz, Screen Refresh Frequency ≥1,920Hz, Gamma Correction -5.0~5.0 , Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature 5000—9300 adjustable, Brightness Correction Pixel by pixel, module by module, cabinet by cabinet, Working Temperature -20~+60 °G, Stored Temperature -30~+70°C working humidity 10% MTBF 5000 hrs,continious working time>=27hrs protection grade IP65,out of control pixel rate(> )>=0.0.1% installation with iron hanging (Make-LED:Nation Star SMP Ground Floor
Building Work
40010432 LED Display Board 4' length X 1 height. Outdoor P 10 pixel,colour red, package SMD 3535,Pixel Pitch 10mm, Pixel configuration SMD3535 Black, Density 10 ,000 pixels/m (real pixel), Module Resolution 32pixel(L) * 16pixel(H), Module Dimension 320mm(L) • 160mm(H) *25mm(D),Driving Mode Constant current, 1/4 duty Module Mask Pure black mask--high contrast screen, Brightness 26,000 cd/m, Viewing Angle 120° (Horizontal); 120°(Vertical, Best Viewing Distance 210m Gray Grade 16,384 levels for each color, Display Color 4.39 Trillion Colors Brightness Adjustment 100 grades by software or automatically by sensor, Max. Power Consumption 28W,Correction Scale Level 12bits Frame Frequency 260Hz, Screen Refresh Frequency ≥1,920Hz, Gamma Correction -5.0~5.0 , Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature 5000—9300 adjustable, Brightness Correction Pixel by pixel, module by module, cabinet by cabinet, Working Temperature -20~+60 °G, Stored Temperature -30~+70°C working humidity 10% MTBF 5000 hrs,continious working time>=27hrs protection grade IP65,out of control pixel rate(> )>=0.0.1% installation with iron hanging (Make-LED:Nation Star SMP Ground Floor
RENEWAL/ REPLACEMENT OF WATER LEVEL SENSORS, PANELS, CONTROLLERS UNITS AND CONNECTED CONTROL PANELS MISC E/M ITEMS FOR WATER SUPPLY DISTRIBUTION SYSTEM AT AFS SULUR
Supply and fixing in replacement 6F HDPE sheathed armoured uni-tube SM optical fibre cable with central loose tube with jelly compound and high quality electro chromium coated corrugated steel type laid over head on existing available supports complete all as specified and as directed.
Construction of Block Level Stadium under Barpali BlockWithout Indoor hall_building
Supply and laying of 6 core Single mode OS2 Unitube Armoured Optical fiber cable through existing conduit: The Fiber should be OS2 Single Mode Optical Fiber Cable of Size 9/125µm. Outdoor Corrugated Steel tape Central loose tube. ( Standard Approved: ISO 11801 2nd edition/ EN 50173-1:2002 / IEC 60794-1/IEC 60793-2-50 class B1.3 / EN 60793-2-50: class B1.3 / ITU Recommendation G.652.D - the oder ITU designations A, B and C are also fulfilled / OS1/ISO/IEC 24702:2006, cat. OS2; also OS1 requirements are fulfilled/IEEE 802.3 - 2002 incl. 802.3ae ) Jacket. (Make should be as per the approved quality and specifications. It should be approved by the user agency (Sports & YS Department) and the works should be executed as per the direction of Engineer in charge.)
Refer to BOQ
Supply, Installation, Testing & Commissioning of 6 core Armoured Fiber CableSix Core Optical fiber cable with its wevelength 1310nm to 1550nm, Armoured Operating temperature : -20 deg C to + 60 deg C Fiber Type : 9/125um (OS1)