Loading…
Loading…
2,208 results • Best match
Building Work
... Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature ...
Building Work
... Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature ...
Building Work
... Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature ...
Building Work
... Input Signal Composite Video, S-video,DVI, HDMI,SDI, HD-SDIControlDistance 100m(Ethernet cable);20KM(optical fiber cable).Cloud Controlled, Support VGA Mode 800*600,1024*768,1280*1024, 1600*1200,Color Temperature ...
Establishing 2X20MVA 110kV Sub-station at Mugalur and Construction of 110kV LILO line from existing 110kV K. B Cross - Mayasandra SC line using Lynx conductor for a distance of 4.27kms in Turuvekere Taluk Tumakuru district on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning
Optical Fibre Cable Accommodations
Establishing of 2X20 MVA, 66/11 kV Sub-Station at Purigali along with Construction of 66kV DC line from the existing 66/11kV Chandahalli Sub Station to the proposed 66/11kV Purigali Sub-station using 110kV Narrow Based Towers with Panther ACSR Conductor for a distance of 7.686Kms and Providing 02 Nos of additional Line Terminal Bays at Existing 66/11kV Chandalli Sub-station for construction of 66kV DC line from proposed 66/11kV Purigali sub station in Malavalli Taluk, Mandya District on Partial TurnKey basis including supply of all matching materials/equipments (Excluding supply of 11 kV Switchgears) and erection (including civil works) of all materials/equipments, testing and commissioning
Optical Fibre Cable Accommodations