Loading…
Loading…
2,026 results • Best match
Providing and Laying cement concrete pavement from RD 0/800.50 to 1/045 along with drain ( Kakira Bazar).
Providing and laying mechnical mixed and vibrated concrete for plain / reinforced grade M-10 (M-ten) nominal mix 1:3:6 (one cement isto three sand isto six graded crushed stone aggregate 20 millimeter (twenty millimeter) nominal size in or under water and curing complete for 14 (fourteen) days, drain and the like drain etcetera including pumping or bailing out water (surface and sub soil water) dewatering for all depth and any quantum of water including removal of slush which many arise at the time of laying under water complete for all heights / depths includes the cost of form work complete as per drawing and M.O.R.D technical specifications clause 802, 803, 1202 and 1203 or as per direction of Engineer-In-Charge including carriage of materails with in all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax,GST or other taxes imposed by the Government.
MOEI and Fans in office bldg campus lighting RMO S-Stn DG Set VRV VRF system, pumps, FAS and CAMC for CCTV system installed at CEC, Patiala SH SITC of Post Top light and laying of OFC cable in campus premises Subwork/Packages: SITC of Post Top light ... and laying of ... of OFC cable ... OFC cable in ... campus OFC cable ... OFC cable in
Providing and laying Kharanja soling for berms in km 135/00 t0 146/00
eProcurement System Government of Himachal Pradesh Created By: Kamal Kishore Gupta Created Date/Time: 02-Apr-2026 04:04 PM Tender Title: Restoration of Damages due to laying of OFC cable in Shimla Mandi via Tattapani road km 135/00 to 146/00 Tender ID: 2026_PWD_129478_1
Optical Fibre Splicing Machine (V2) as per TEC 88090:2012 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7041516 Dated : 26-12-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 30 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Optical Fibre Splicing Machine (V2) as per TEC 88090:2012 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Ribbon Optical Fiber Splicing Machine as per TEC Specification (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6909147 Dated : 17-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ribbon Optical Fiber Splicing Machine as per TEC Specification (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
CCTV CAMERA NETWORKS SYSTEM FOR TNPL FACTORY AND INSTALLATION AND COMMISSIONING OF CCTV CAMERA AND OTHER NETWORKS ACCESSORIES INCLUDING OFC CABLE LAYING AND SPLICING
INSTALLATION AND COMMISSIONING OF CCTV CAMERAS AND OTHER NETWORK ACCESSORIES INCLUDING OFC CABLE LAYING & SPLICING WORK IN TNPL FACTORY