Loading…
Loading…
2,036 results • Best match
Restoration of road cut made by Airtel against UID No.202410162114596 for laying OFC in Ward No. 201 Lalita Park in AC-58 Shah. South Zone
Government eProcurement System Created By: SATISH KUMAR Created Date/Time: 27-Mar-2025 03:55 PM Tender Title: Restoration of road cut made by Airtel against UID No.202410162114596 for laying OFC in Ward No. 201 Lalita Park in AC-58 Shah. South Zone Tender ID: 2025_MCD_230816_1
Quotation Enquiry for Supply and Laying of OFC From New Academic Blocks Server Room to CAD CAM First Floor at Mechanical Engineering Department
Supply and laying of OFC from New Academic Block’s server room to CAD-CAM first floor: The bidder shall be responsible for supplying and laying 6-core Single Mode Armored Optical Fiber Cable (OFC), including digging and installation following standard process. Warranty: 3 years excluding physical damage
Design, Engineering, Supply, Installation, Testing and Commissioning of underground Optical Fibre Ba
Testing and Commissioning of underground Optical Fibre Ba
DEPOSIT- Installation of Optical Fiber Network for Various Electronics Works and WiFi Connectivity at Parippally Medical College Kollam.-Supply and Installation of WiFi System at Parippally Government Medical Collage-General Electronics Work
OD201994/2025-2026:Supply , laying, certification and documentation of 23 AWG CAT-6 UTP 4 twisted pair sheathed copper wire cable that can support data transfer rates of up to 1 giga bits, cable having LSZH capability through the existing conduit and casing and capping as required. Preferred Make: Actassi, Belden, R and M, Molex or equivalent.
24 core OFC Unarmoured cable single mode, HDPE pre lubricated pipe 40 mm dia with rope, Manual digging, splicing and laying of OFC at the depth 1.65 mtr inside HDPE pre lubricated pipe, OLT Optical line terminal 24 port GPON with PON, ONU Optical ... snap, OFC route ... Force OFC , ... SC OFC Patch ... crossing, OFC enclosure ... port, OFC splitter ... of OFC FDF ...
Manual digging ,splicing and laying of OFC at the depth 1.65 mtr inside HDPE pre lubricated pipe manual digging ,splicing and laying ofOFC at the depth 1.65 mtr inside HDPE pre lubricated pipe
CABLE CONSTRUCTION WORK INCLUDING TRENCHING,PIPE LAYING,HDD,CABLE BLOWING AND OTHER ALLED WORKS IN ABOVE SECTION FROM NO.DE/OFC/SLM/LT-06/22-23 IN NAMAKKAL-MUSIRI 24F PW IN SALEM DIVISION