Loading…
Loading…
16,509 results • Best match
Work of Epoxy painting in the Middle Inspection Gallery (MIG) of Tehri Dam
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Execution of painting and lettering works for various S&T installations under CGM- JP Jurisdiction of DFCCIL
Painting of two coats of synthetic enamel paint over one coat of primer on iron/steel fencing around co-located ALH-TH/GSM-R Tower/Non-Co-located ALH-TH/EI Hut after scraping & 2 cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. The paint and primer should be from Asian Paints/Nerolac/Dulux/Berger. The primer/enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970)/ (IS 2932 of 1974).
Works contract for Fabrication, assembly and painting of Auto Weld Beams at Fabrication Plant, Jagdishpur under Framework Agreement
Works contract for Fabrication, assembly and painting of Auto Weld Beams at Fabrication Plant, Jagdishpur under Framework Agreement. (Details As per NIT )
Construction for compound and painting, interlocking installation work at Indira canteen at soraba TMC
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, ...
Repair and painting work of Football Ground for Occasion of 15th August 2026 at DVC, Panchet
Repair and painting work of Football Ground for Occasion of 15th August 2026 at DVC, Panchet
Wall construction work for theme painting near the hospital at Jain Mandir intersection.
M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis)