Loading…
Loading…
16,241 results • Best match
Refer to BOQ
Providing and fixing inauguration stone (granite of size 3/x 2/-0/) including engraving , painting, writing and const. of pedestal of size 4/-5// x 5/-5// height by way of brick work, plastering and painting incl. all leads , lifts and carriage of material by M.T./H.L.
Refer to BOQ
Providing and fixing inauguration stone (granite of size 3/x 2/-0/) including engraving , painting, writing and const. of pedestal of size 4/-5// x 5/-5// height by way of brick work, plastering and painting incl. all leads , lifts and carriage of material by M.T./H.L.
Refer to BOQ
Providing and fixing inauguration stone (granite of size 3/x 2/-0/) including engraving , painting, writing and const. of pedestal of size 4/-5// x 5/-5// height by way of brick work, plastering and painting incl. all leads , lifts and carriage of material by M.T./H.L.
E-Tender for Construction of RO Plant each to the capacity of 2000 litres in three locations at St.Thomas Mount and Pallavaram
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Engineer-in-Charge before use on works.)
Annual Plan-2025-26 / Pala Municipality-326/26 Kanattupara Anganwadi Renovation-General Civil Work
OD504621/2025-2026:Splaying and fixing MS wire mesh including welding to existing frame work,painting and conveyance etc.complete.
Works
Providing wall paintings of differents parttern,different shades of Mural Arts paintings of apporved coiours and designs over base coats of acrylic exterior emulsion paint havings VOC[volatile organic compound]content less then 50grams/liter of apporved brand (asian paints)berger weather coat extirior/apex exterior paint(asian paints)or apex ultima paint and shade over priming coat after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,including cost and conveyance of all materials to worksite and all operational,incidental,Artist charges, labour charges etc,complete for finished item of work as per direction of E.I.C.