Loading…
Loading…
15,255 results • Best match
Design, supply, installation, testing and commissioning Internal Piping (IP) for Piped Natural Gas (PNG) as per PNGRB guidelines and as per Specification Mech/MH/PNG/4200/GM Dated 08.06.2026
J-Installation, Fabrication, Painting, Internal testing, Nitrogen purging &
Supply, Delivery of spare parts and Repair foundry work to the vehicle No AP 39 TP 7354 water tanker leak, chassis Problem. (Rc.V1-111776/2026
Body Full Painting
Comprehensive development work of Ramdev Park and Adjacent building in ward no.51(57) Rajmahal Nagar
Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand ...
NAVA KERALA SADAS 2024 25 SURFACE RENEWAL PARIPPALLY MADATHARA ROAD PROVIDING PATCH BM BC OVERLAY AND ALLIED WORKS FROM CH 24000 TO 27800 CHADAYAMANGALAM LAC
... grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols ...
Repair and Maintainance Work Arrangements at Aringar Anna Maligai DC office and Purchase of Furniture at CHO Quarters in ward no 31
... connection, TW plugs, screws and also giving necessary connection to the PVC pipe and painting the CI brackets with 2 coats of approved paint over one coat of red oxide primer, dismantling the masonry and redoing the dismantled... tank with all accessories should be got approved by the Executive Engineer before use on works) Floor Fitting
Providing for Partition Wall Arrangement to ITI Building Ward No 02 in Madhuranthagam Municipality
Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)