Loading…
Loading…
15,604 results • Best match
Comprehensive development work of Ramdev Park and Adjacent building in ward no.51(57) Rajmahal Nagar
Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand ...
NAVA KERALA SADAS 2024 25 SURFACE RENEWAL PARIPPALLY MADATHARA ROAD PROVIDING PATCH BM BC OVERLAY AND ALLIED WORKS FROM CH 24000 TO 27800 CHADAYAMANGALAM LAC
... grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols ...
Repair and Maintainance Work Arrangements at Aringar Anna Maligai DC office and Purchase of Furniture at CHO Quarters in ward no 31
... connection, TW plugs, screws and also giving necessary connection to the PVC pipe and painting the CI brackets with 2 coats of approved paint over one coat of red oxide primer, dismantling the masonry and redoing the dismantled... tank with all accessories should be got approved by the Executive Engineer before use on works) Floor Fitting
Providing for Partition Wall Arrangement to ITI Building Ward No 02 in Madhuranthagam Municipality
Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
GENERAL-Budget 2019 -20 (20) Iverkulam Town Beautification and Infrastructure Development-Dharmadam Constituency General Civil Work
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Repairing of community centre near Agent office of Siduli colliery under Kenda Area
... including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of... all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes 15.mm Dia