Loading…
Loading…
15,470 results • Best match
SUPPLY INSTALLATION AND COMMISSIONING OF 1 NOS. AMAR SHAHEED ASHISH KUMAR MISHRA RETRO GATE AT GRAM FAREEDPUR AUDHAN BLOCK CHAYAL IN ASSEMBLY CHAYAL DIST. KAUSHAMBI U.P.
painting and varnishing new work in iron 641+642
Constt.of Development of Shamshan Ghat at Pakhiyan Pyt Bhalwal Lower Block Bhalwal scheme (C.D.F.) YEAR 2026-27
Providing and fixing Display board including painting and writing all complete.
CLEANING AND OTHER ALLIED WORK OF STATION CAMPUS AT STATION NO 4 UNDER TPS.
PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 19(1) Supplying, fitting and fixing PVC pipes of approved make of Schedule... including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of ...
Vikas khand Sadar ke antergat Gramin Margo per patch marammat ka karya FY-26-27-706-2
... material, triming of completed excavation to proved firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of exavation as per clause 503 back filling the pot-holes... including cost of bitumen, cost all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Vikas khand Bihar ke antergat Anya Zila Margo per patch marammat ka karya in FY-26-27-706-1
... material, triming of completed excavation to proved firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of exavation as per clause 503 back filling the pot-holes... including cost of bitumen, cost all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Estimate for the repair and renovation of the residence building, including the CMC Camp Office and the Municipal Commissioner residence, in Ward 27, Division 3B, Zone III, MCG
Applying painting with Interior grade Royal ultima Paint with water based Emulsion with 2 coats or more in desire shade and color, to provide smooth finish as desired. Finish as per satisfaction of engineer in charge.