Loading…
Loading…
228 results • Latest
COMPREHENSIVE REPAIR TO OTM ACCN IN SECTOR A AT LEH UNDER AGE BR II OF GE 865 EWS
Provn of wooden panelling on wall/ceiling using following specifications including taking down old wooden panelling complete all as specified and directed:- (a) S&F 2nd class hard wood wooden gutties of size 25mmx25mmx 200mm depth fixed in wall by making holes in brick wall and making good in cement mortar 1:3 complete all as specified and directed. (b) S&F horizontal runner 2nd class soft wood (Kali at 120 c/c of sectional area exc. 13 Sqm and n. exc 25 Sqm clean sawn treated with two coats of creoste oil mixed with good quality pesticide for antitermite treatment. (c) S&F 1st class soft wood (Deodar) boarding 12mm to 15mm thick as in wall panelling planed one side, wrought and other side clean sawn and applying two coats of good quality varnish on plain surfaces over a coat of primer mixed with good quality pesticide for antitermite treatment on the other side and fixed with screws/nails on wooden runners. (d) S&F 1st class soft wood (Deodar) decorative beading 40mm wide on top surface of wall panelling including two coats of varnish complete all as specified and directed.
New Construction of Urban Haat at Deesa Dist : Banaskantha
in ration 1:3 with soil, pesticide & insecticides. Plant should be disease free and fungus free 8"x10" polythene bag. Plastic bag or pots
Development of Junctions i.e., Junction Development along Thorrur Main road at Medical College Turning in Mahabubabad Municipality.
Based on Item No.5.a of HMDA (FSR), Pg.40-Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
Building Work
50005683 Planting of Fox tail palm 7'0' ht.ornamental decorative specimen plants well established healthy disease free in poly bag / big container including transportation and delivery at sites.Planting of each plant at specified location by application of fortilizer and pesticide as required as per instructio of Officer in-charge.This cost is including hoeing soil of size 3'dia and 3' depth, mixing spreading soil and manure in 2:1 ratio, watering, maintenance for 30 days or more till the plant establish properly, as per direction of the officer in charge . a) plant 5.3,p-324=Rs.1183.00, stacking 7.44,p-349= Rs.650.00, digging hole 2.14.1,p-218= Rs 214.77, antitermite 2.54,p-246=Rs.92.68, shaping 2.38 ,p-236=Rs.53.60, cattle manure 2.25,p-224=Rs.374.12, fencing 2.23Sqm 2.58,p-248= Rs. 193.58x2.23= Rs 431.68 Total cost=2999.85(say Rs.3000.00) [N.S.W.I] Ground Floor
Building Work
50005683 Planting of Fox tail palm 7'0' ht.ornamental decorative specimen plants well established healthy disease free in poly bag / big container including transportation and delivery at sites.Planting of each plant at specified location by application of fortilizer and pesticide as required as per instructio of Officer in-charge.This cost is including hoeing soil of size 3'dia and 3' depth, mixing spreading soil and manure in 2:1 ratio, watering, maintenance for 30 days or more till the plant establish properly, as per direction of the officer in charge . a) plant 5.3,p-324=Rs.1183.00, stacking 7.44,p-349= Rs.650.00, digging hole 2.14.1,p-218= Rs 214.77, antitermite 2.54,p-246=Rs.92.68, shaping 2.38 ,p-236=Rs.53.60, cattle manure 2.25,p-224=Rs.374.12, fencing 2.23Sqm 2.58,p-248= Rs. 193.58x2.23= Rs 431.68 Total cost=2999.85(say Rs.3000.00) [N.S.W.I] Ground Floor
Building Work
50005683 Planting of Fox tail palm 7'0' ht.ornamental decorative specimen plants well established healthy disease free in poly bag / big container including transportation and delivery at sites.Planting of each plant at specified location by application of fortilizer and pesticide as required as per instructio of Officer in-charge.This cost is including hoeing soil of size 3'dia and 3' depth, mixing spreading soil and manure in 2:1 ratio, watering, maintenance for 30 days or more till the plant establish properly, as per direction of the officer in charge . a) plant 5.3,p-324=Rs.1183.00, stacking 7.44,p-349= Rs.650.00, digging hole 2.14.1,p-218= Rs 214.77, antitermite 2.54,p-246=Rs.92.68, shaping 2.38 ,p-236=Rs.53.60, cattle manure 2.25,p-224=Rs.374.12, fencing 2.23Sqm 2.58,p-248= Rs. 193.58x2.23= Rs 431.68 Total cost=2999.85(say Rs.3000.00) [N.S.W.I] Ground Floor