Providing and Laying 150mm dia K-9 D.I. Pipe Water Supply Main line in Fagna Chowk to Hathras Halwai 33ft road and Fagna chowk to sabzi mandi and 100mm dia PVC Pipe Water supply line in Various streets of B- Block, Opp Community center(Recall)
Improvement of Water supply With Laying of New 160 mm dia HDPE pipe line (135 mtr) and New 110 mm dia HDPE pipe line (48 mtr) with other allied works from 25/A, Makenji lane to 14 Becharam Chowdhury lane and 24/25, Becharam Chowdhury
Laying of 600 mm dia pipe (100 mtr. Length M.S. and 200 mtr. Length D.I) and 500 mm dia D.I. pipe from Olabibitala UGR (Manifold) upto the Junction of Netaji Subhash Road via Swami Vivekananda Road, Under Ward no -25 and 26(4th Call)
Operation and Maintenance Power House/Power Plant - Break down maintenance of Induced draft Cooling tower 24 No and its internal pipeline and associated works including cleaning of columns and beams outlet gates etc 2x210 MW PTPP Parichha Jhansi UP
... tower 24 No and its internal pipeline and associated works including cleaning of columns ...
Immediate measures, including the construction of an earthen ramp at the marshy site and bunding to prevent external water ingress from adjoining waterlogged fields, to enable restoration of the 1200 mm PSC pipeline.
Estimate for Making Pipeline Arrangement from Pump House No. 2 to the Water Sump at Katora Railway Siding and repairing of boundary wall with concertina fencing at Katkona Sub Area of Baikunthpur Area
Special Repairing work in connection with Augmentation work at total command area of Ichhapur WSS, to repair the damaged pipeline due to road widening and drain construction within Bongaon Sub Division, under Barasat Division, PHE Dte.
Restoration of Rain damages to WSS Hadsar Tehsil Bharmour distt Chamba SH Const of 3 No stone masonary intake chamber and providing laying jointing of HDPE pipe 32,25 20 mm dia
Providing laying tranches HDPE pipe i/c fitting such as a tees ...
Laying of HDPE Pipeline from 1) D.No. 5/1134-B to D.No 5/1311-1, 2) D.No. 5/1125-1 to D.No 5/1105, and 3) D.No. 5/1124 to D.No. 5/1121 in 32nd Ward Yemmiganur Municipality
Laying of HDPE Pipeline from 1) D.No. 5/1134-B to D.No 5/1311-1, 2) D.No. 5/1125-1 to D.No 5/1105, and 3) D.No. 5/1124 to D.No. 5/1121 in 32nd Ward Yemmiganur Municipality
Laying of UPVC Pipeline, Supply of Valve and Construction of Valve Chamber at Satishnagar Village under Paschim Bhatjangla Zone-I PWSS within Krishnanagar-I Block in Nadia District under RWS Nadia Sub-Division under Nadia Division, PHE Dte.
Supplying and laying of 8 PVC Pipe for Nehru Nagar Main Road,Nehru Nagar 1st Main Road and Nehru Nagar 1st Street in Div-195, U-45, Zone-15
Providing and Laying of UPVC 10 inch dia ISI Marked Sewer pipe line and DI K7 Water supply line in Karakhan Mohalla and Tobri Mohalla Ward 69 Zone 1
Laying of RCC Hume pipe for drainage of contaminated water from Municipal Corporation Sampabel to near Hanuman Gadhi Road in Guba Garden under Zone 06 Ward 35 Kalyanpur North.
Laying of RCC Pipe line and table drain from central median near Peerzadiguda kaman to existing nala near ward no 10 Peerzadiguda of Boduppal Circle-10 Uppal Zone MMC
Laying Jointing and testing of GI Pipe P_F Sluice valve supply and installation three phase sludge pump of 5 HP and 1 HP submersible sewage pump alongwith allied accessories
LAYING AND INTERCONNECTION WORK OF 80 MTR 110MM DIA HDPE PIPE LINE IN SURYODAY NAGAR COLONY Mr DRAVIN YADAV HOUSE TO Mr PRADEEP KUMAR SINGH HOUSE IN VARUNAPAAR ZONE.
Laying of 1200mm dia pipe through jacking process in front of Maruti suzuki showroom Brahm nagar under ward-05 Jawahar nagar and ward-37 Ashok nagar in zone-4.
Providing , Laying 10 inch dia. UPVC pipe Sewer Line at Flower Valley and 4 inch dia. DIK7 water supply Line at Flower Valley and Gagandeep colony at East Constituency.
CO Modular Steel water storage tank of 20000 liters capacity, CO Thrust Block and Laying, Jointing and Testing of GI Pipe for Rising Main UNDER BASP BSP 2024 949
Providing Laying jointing of GMS pipe with circumferential Butt Welding 200 mm dia from RD 2700 to RD 4770 RD 4200 to RD 4250. RD 4600 to RD 4680
CO Main Storage Tank of 50000 Ltr. Capacity and Providing, Laying jointing and Testing of GI Pipe 50mm dia RD 0 to 3500 3500 Rmt DC Deposit Under BASP
Manufacture, Supply, Delivery & Laying of G.I Pipe Line in Dhobhi Ghat, Ganga Nagar, Ward No.23under 15th FC Grant 2024-25 (2nd Installment) Untied Grant in S No 4
Laying of 600mm dia RCC pipe line and Road profile correction at Rajiv Gandhi International Stadium Entrance for removing water stagnantion in Habsiguda Ward-25, Uppal Circle-9, MMC
Laying of 200 mm & 110 mm dia HDPE Pipe line from Door No 30-879 to 30-822 in Teacher's Colony in Dharmavaram Municipality under General Funds 2026-27
Providing/ laying and fitting of main/ distribution pipe line including construction of collection chamber under the up-gradation/retrofitting of Water Supply Scheme Juldoo Rangdum id. 8383840 (under JJM).
Laying of Loop Pipe Line for distribution System at Hutmura Mouza under command area of Hutmura W/S Scheme of Purulia Sadar Sub-Division under Purulia Division, PHE Dte .
Installation of 2 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe for withdrawn water of drinking tubewell by using Water jet system ...(ii) Makarampur Mal Para and repairing of pipeline leakage from Shani Mandir to Med Plus in ward
NIT 39.1 Work of construction Commissioning of 200mm dia TW and 90mm HDPE pipeline at RWSS Asti Kalan at Bus Stand Under Sub Division Govindgarh, District Jaipur
Custom Bid for Services - 200148923 BIENNIAL MANPOWER CONTRACT FOR THICKNESS MEASUREMENT WORK AT ADM- PIPELINE AREA at VSTPS Similar Category Operation and Maintenance Power House/Power Plant
CA-CWPH-Unit-II-Cleaning Grit blasting and applying a coat of zinc rich primer and brushable ceramic epoxy material to an average thickness of 2000 microns in condenser cooling water inlet cast steel pipelines of both A B passes in Unit-II
Laying of 100mm id D.I Pipeline 865 Mtrs. Providing Functional Household Tap Connection 100 Nos. 1 No. additional Storage and sendimentation tank having size of 54.25 by 54.25 by 1.83 Mtrs. 1 No. Supply, Installation and commissioning of ultrason
Supply and laying of water supply pipe line from main source to reserve chamber point for Upper Jagar of GIOM in the district of Kendujhar. (Under CSR Scheme). (Re-Tender)
Providing laying and Jointing 50 and 80 mm dia for replacement of damaged GI pipe line at Different place in ward No. 47 (Maulik Nidhi) file No. 240/25X9/1
Construction of silt catch pit and laying of HDPE pipe connecting to the storm water drain at Adithanar Salai and Rukmani Lakshmipathi Salai in Div-61, Unit-14, Zone-5
Providing Laying and Jointing 50 and 80 mm dia for Replacement of damaged GI pipe line at Different place in ward No. 40 (Maulik nidhi) file No. 239/25X9/1
Laying of 90 mm HDPE Pipe line Near of Purushottam Member house to Soorsain Saini chok At Mohalla Banoodkchiyaan Ward no 07 in the limit of Nagar Palika Parishad Dhampur
Repair and Maintenance of water supply network by providing and laying of 100mm DI pipe in gali no. 14A/5 Sadh Nagar ward of Palam constituency under EE(C )-26.
Repairs to Existing Sewer network and Laying of New UGD Pipe Line at Various places in Ward No.126 Gandipet of Circle-45 Narsingi SLP Zone, CMC (ITEM NO.03)
Repairs to Existing Sewer network and Laying of New UGD Pipe Line at Various places in Ward No.125 Kokapet of Circle-45 Narsingi SLP Zone, CMC (ITEM NO.02)
Job work for raising of manholes and jointing of missing links of sewerage pipeline in west side of Railway line under M.C. Panipat. ONLY FOR L/C SOCITIES
DEPOSIT-UTILITY SHIFTING PHASE 1-WORK OF TEMPORARY RELOCATION OF EXISTING PIPELINE AT RAILWAY CROSSING IN REACH 5 PARASSALA (NEAR PANCHAYATH OFFICE) BR.NO 125 AT KM 248-900-0 (CN CH-248910) CONNECTION WITH WIDENING OF TRACK OF INDIAN RAILWAY-Pipelin
100.9.8:Laying uPVC pipes of class 2 to class 6 and... solvent cement and testing the pipeline with water to the required test pressure ...
Continuation work of erection of motor pump to Nisarga borewell at w no 22 and replacement of pipeline in Induguri and Jogulabettu at w no 12 in Karkala TMC limit
Earth work excavation for pipelines/cables by Manual means upto ...
Construction of 30000 Ltr OHT and laying of Pipe Line in Panchanthirthi at Kunnapattu Panchayat in Thiruporur Panchayat union in Chengalpattu District for the Year 2025-26having Package No . 1/2025-2026 Panchayat Funds
Construction of 30000 Ltr OHT and laying of Pipe Line in Panchanthirthi @ ...
Laying of 90mm HDPE pipe line works for Water Supply at Ward No. 28 Soodasasndiram 28 Sanasandiram sump to Gamgamma Temple Ward No. 30 Therpettai Theppakulam Nagar in Hosur City Municipal Corporation
Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete.
referred to NIT
SUPPLY & Laying OF G.I. PIPE 100 MM. (Non TATA).
Extension of Pipeline from DTW Schemes in Various GPs/VCs Including Domestic Connections and allied Works, under Bishalgarh RD Block within the Jurisdiction of DWS Sub-Division Bishramganj during the Year 202627 (Gr-1)
... of soil as required after laying of pipe line, in layer not exceeding ...
Construction of 450mm dia NP2 hume pipe drain and laying of paver block from house of Ashutosh sharma to main road Via. Ayodhya tiwari and maheshwar prasad in ward no. 34 Under AMC
... Construction of 450mm dia NP2 hume pipe drain and laying of paver block from house ...
Laying of HDPE pipe line for Water Supply at Jayka Dhaba Gali to Atal Path Ma jiya Sarita Niwas to Nala Atal path to pharma Angregi Dawakhana & House to House Connection in Ward No. 07
Laying of HDPE pipe line for Water Supply at Jayka Dhaba Gali to Atal Path Ma jiya Sarita Niwas to Nala Atal path to pharma Angregi Dawakhana & House to House Connection in Ward No. 07
Laying Jointing and testing of Gravity main 65mm dia (M) by cutting welding of GI pipe at various RDs C/O RCC Anchor Blocks 7 Nos Laying joiting and testing of Gravity main 65mm dia 300 Rmt 50mm dia 250 Rmt and C/o Head weir at Kasan Khad
... made from parent tubes. The laying of pipe will include all operation ...