Material Handling Equipment Package For KKNPP - 5 and 6
Renovation Grid Synchronization and Operation and maintenance of Sapteshwar small Hydro Project (2x150 KW) in District Champawat (by deploying manpower with supply of material and consumables) for a period of three years
Supply and fixing of 3 phase 4 wire energy meter with 0.5 class accuracy including testing of meters from concerned UPLC lab.
New Construction of Urban Haat at Deesa Dist : Banaskantha
Voltage, Frequency, Apparent energy, Apparent power, Active and reactive energy, Active and reactive power, Average voltage Vavg,
Supply of Desktops and Laptops for KSRSAC
10 Ports 1 USB 3.2 Gen 2x2 Type-C port with DisplayPort alt mode/Power Delivery 1 USB 3.2 Gen 1 port 1 USB 3.2 Gen 1 port with Power Share 1 USB 2.0 port 1 HDMI 1.4a port 1 RJ-45 Ethernet port 1 Universal audio port 1-barrel power adapter port 1 microSD 3.0 card slot 1 wedge-shaped lock slot
NCTPS I Operation Circle CA Dn CWPH Breakdown works of Unit I CWP 1A 1B and 1C and its suction bay Travelling water screen system BHEL Make Model CW1Q Vertical pump Capacity 16 500m3 Hr per pump during the year 2026 27
Charges for Breakdown Works of 3 sets of Pump Pull Out Assembly of CWP, by removal of flexible coupling, taper coupling, bearing housing with all internals, Motor stool stuffing box, lubricating water line and air vent line; dismantling of bush, seating, drive shaft, spiders, deflector, intermediate shafts, enclosing pipes, muff couplings, pump shaft, delivery taper, pump casing, impeller and cone lock nut; cleaning of all the pump parts, all fasteners; renewal/replacement of new/old rectified spare(s) and reassembling the Pump Pull Out Assembly intact and satisfactory commissioning, including cost of all consumables and hire charges for T & Ps, and cost of Muff coupling bolt complete.
NCTPS I SE M II Circle AHP Dn Unit I II III Outsourcing of Operation and Maintenance of PDFAC System for a period of 90 days or until completion of Quantity 78000 MT Whichever is earlier
Unit I, II & III - Outsourcing of Operation and Maintenance of PDFAC System consists of PLC, Switch gear panels, modules, breakers, Fly ash conveying, Instrument compressors, Intermediate conveying and Instrument compressors and Auxiliaries, PDFACS equipments in ESP area, Intermediate silo, cooling tower and fly ash pipelines to a length of 1500 Mtrs from ESP NCTPS-I to 1000 MT silo top located at NCTPS Stage-II including structural supports, silo top target box, vent bag filter system, silo unloading chutes, loading the fly ash vehicles round the clock and 100 MT Weigh bridge and Auxiliaries, cleaning of silo area and silo approach road for a period of 90 days or until completion of quantity (78000 MT) Whichever is earlier. Including cost of labour, spares and consumables, etc.