Loading…
Loading…
2,468 results • Best match
Electrical (General) work in connection with "Improvement of PF surface, TTE rest room etc. & repair and construction of central drain between platforms, other ancillary work at DKAE".
Trenching, laying under road / track through 50 mm dia GI pipe ( medium gauge ) including supply of GI pipe and commi- ssioning of cable including back filling of trench with excavated soil after laying of cable ( Cable will be supplied by Railway ) Above/
DISPOSABLE BABY WRAPS FOR NEWBORNS
Approved Sources Description :DISPOSABLE BABY WRAPS FOR NEWBORNS ] CENTRAL HOSPITAL HUBBALLI, Karnataka 200.00 Numbers SWR RAILWAY HOSPITAL 50.00 Numbers Consignee BENGALURU, SWR RAILWAY HOSPITAL MYSURU, 50.00 Numbers SWR
ATROPINE 0.6MG PER ML OF 1ML INJ
Description :ATROPINE 0.6MG PER ML OF 1ML INJ ] CENTRAL HOSPITAL HUBBALLI, Karnataka 950.00 Numbers SWR RAILWAY HOSPITAL 600.00 Numbers Consignee BENGALURU, SWR RAILWAY HOSPITAL MYSURU, 200.00 Numbers SWR
DOMPERIDONE 1MG PER ML OF 30ML SUSPENSION
Description :DOMPERIDONE 1MG PER ML OF 30ML SUSPENSION ] CENTRAL HOSPITAL HUBBALLI, Karnataka 1150.00 Numbers SWR RAILWAY HOSPITAL BENGALURU, 230.00 Numbers Consignee SWR RAILWAY HOSPITAL MYSURU, 270.00 Numbers SWR
I.V.NORMAL SALINE 0.9% 3000 ML
Approved Sources Description :I.V.NORMAL SALINE 0.9% 3000 ML ] CENTRAL HOSPITAL HUBBALLI, Karnataka 95.00 Numbers SWR RAILWAY HOSPITAL 10.00 Numbers Consignee BENGALURU, SWR RAILWAY HOSPITAL MYSURU, 12.00 Numbers SWR
Execution of P-Way works in between Howrah - Kharagpur section - 1) TFR for 23 Km. 2) TBR - 21.945 Tkm. 3) SEJ & Glued Joints renewal 4) TTR(CS+CMSC) 63 sets 5)TRR(P) - 23.764 Tkm under the jurisdiction of Sr.DEN/East/KGP (2nd call)
54.00 Expansion Joint) assembly during line block and its replacement with plain track as of adjoining section with all fittings including rail cutting and drilling of holes and renewal of special sleepers with PSC Sleepers as directed and aligning rails, providing fishplates and bolts/ temporary connection with adequate welding gap with adjoining rail and ensuring proper track geometry for 30 kmph speed. The release material shall be stacked as directed by Engineer in charge. Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers a v a ila b le anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores.