Loading…
Loading…
2,460 results • Best match
Running Contract for Budesonide CFC free lnhaler,100 mcg. Per puff, at least 200 metered dose canisters.
Description :Budesonide CFC free lnhaler,100 mcg. Per puff, at least 200 metered dose canisters. Product should be available in the approved product list of Railway Board. ] CMS-CKP, SER Jharkhand 120.00 Numbers Consignee DMO-ADA, SER West Bengal 720.00 Numbers MEDICAL DIRECTOR /GRC, SER West Bengal 200.00 Numbers
CONCLUSION OF CONTRACT FOR SUPPLY OF VEG FRSH AND ICE (MACHINE MADE) AT SUPPLY DEPOT ASC AMBALA FOR THE PERIOD FROM 01 OCT 2026 TO 30 SEP 2027
ICE (MACHINE MADE) (Delivery Point for Delivery at Unit Lines/Railway Stations within Radious of 13 Kms)
(1) Closing of LC no.35/C at km 42/9-43/0 by connecting road to LC no. 36/C at km 42/9-43/0 in KHMA-BNSA section (2) Improvement of connecting LC roads by re- surfacing in jurisdiction of ADEN/PBE Izzatnagar division of N.E.Railway.
Providing and removing barricading with the Metre help of portable fencing made of wooden ballies / steel pipes to be provided along the length at a distance of 3.5 m from centre line of the nearest track where the days work to be done in closed vicinity of the track . The fencing shall be provided as mentioned in special condition of contract under the heading " SPECIAL CONDITION REGARDING INSTRUCTIONS ON SAFE WORKING NEAR RUNNING RAILWAYS TRACK " and as per direction of engineer in charge .
Special track repairs and maintenance of the section in SSE/P.way/OBRA under ADEN/CPU.
56.00 using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual
WD-SC-KZJ section: Complete Track Renewal (S) of exg 90R/52/60kg rails with 60Kg/90UTS (Cl-II) rails on PSC6 / wider base sleepers with 1540 Nos/KM / 1660Nos/KM density for a length of 11.913KMs and Through Sleeper Renewal (S) of existing ST/CST-9/PSC5 sleepers with PSC6 / wider base sleepers with 1540 Nos/KM / 1660Nos/KM density for a length of 1.134KMs at various yards under DEN / Central / SC section.
294.00 1443.86 using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. Shifting & pairing of rails / panels unloaded alongside existing running track to adjoining formation of a new line including crossing of one track, duly lifting & pushing rail / panel without damaging it and taking all necessary precautions, so as not to infringe the running track, as directed by Engineer in-charge. Note: The rail barricading, if disturbed during working, should be restored to its original condition by the agency including re-fixing & concreting as required.
Bush for TRCC for MR-300 Series Rakes
Description :Bush for TRCC for MR-300 Series Rakes of Kolkata Metro Railway as per Metro Railway's Dra wing No.: MR/POH/AC-0-007. [ Warranty Period: 12 Months after the date of delivery ] ] Consignee SSE/S/RS/NOA, METRO West Bengal 200.00 Numbers Inspection Details Stage Inspection Not Required