Loading…
Loading…
1,959 results • Best match
25KV PSI Work in connection with Replacement of overaged PSI equipment CB, BM and earthing at DTAE/TSS and KWAE/TSS to improve reliability under Howrah Division of Easter Railway.
Loading, unloading and Transportation of Railway materials/scrap/ released items or as per directive of consignee-in-charge.
Refurbishment of 2400 Nos. CTRB Class 'E' upgraded (6" x 11") (Timken Make) for a period of 02 years (As per Scope of Work) of Mechanical Workshop N.E. Railway Izzatnagar.
One Time Drain cleaning of starting from Jessore Road from 2 No. Railway Gate near Electric Supply Office upto Muktidham Burning Ghat within Ward No 21 and 22 under Habra Municipality
One Time Drain cleaning of starting from Jessore Road from 2 No. Railway Gate near Electric Supply Office upto Muktidham Burning Ghat within Ward No.21 and 22 under Habra Municipality
Zonal works for General repairs and maintenance of service buildings, staff quarters, Gate lodges and others new minor works etc. from Barasat Railway colony (including) to Hasnabad under Section Engineer/ Works/Barasat in the jurisdiction of Assistant Engineer/Barasat. [Zone No.12 for the period ending 30.06.2027]
A-Miscellaneous lump sum works covering all the chapters of the DSR [Ver-1]-2023/ Above/
Electrical work for Upgradation of cables and Internal wiring Systems at Railway Establishments at The stations:LRJ,YNRK,RSHK,DDN,HW etc & Electrical work for Enhancement and Upgradation of Earthing and Safety Protection Systems for Electrical Equipment at HW and adjoining locations.
Laying, underground/road/Railway track, recessing in platform/ wall along with Rly. Track/in laid RCC/GI pipe as required 11KV grade HT XLPE insulated armoured, aluminium conductor cable including making chase & plastering after laying of cable/digging of cable trench, sand cushioning, protective covering with second class bricks width wise and afterward filling the trench 2 with excavated soil on road/floor where cable to be laid shall be made good as original by the firm at his own cost and labour. Provision of cable route marker as per Tech. Specification including end terminations with aluminium clamping socket/lugs, testing & commissioning and shall be in conformity to IS 1255 /1983 (Latest Version). Excavation shall be done complying with code of safety as per IS 3764/1992. Cable route plan should be submitted by firm for approval of C.A.before execution. Cable route marker should be attached with the laid cable through 'J' hook and display board should be above the ground. Cable of size 3C X120 Sqmm will be supplied by Railway.
Withdrawing damaged 160 mm dia HDPE pipe during construction of boundary wall by railway department and laying new HDPE pipe under Kajora Water supply scheme under RCFA Division-I PHE Dte.
Withdrawing damaged 160 mm dia HDPE pipe during constructionj of boundary wall by railway department and laying new HDPE pipe under Kajora Water supply scheme under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)