Loading…
Loading…
6,056 results • Best match
Supply, Installation, Testing Commissioning of 20 nos. of CCTV near 20 no railway gate,H/O-Pankaj Da,Shop of Homepathy,Friends Club and others within the Booth No. 107/123 under North Barrackpore Municipality under the scheme of AMADER PARA AMADER
Name of the Work : Supply, Installation, Testing & Commissioning of 20 nos. of CCTV near 20 no railway gate,H/O-Pankaj Da,Shop of Homepathy,Friends Club and others within the Booth No. 107/123 under North Barrackpore Municipality under the scheme of "AMADER PARA AMADER SAMADHAN" (APAS) Scheme Title : INSTALATION OF 20NOS OF CCTV CAMERA NEAR 20 NO RAIL GATE, H/O PANKAJ DA, SHOP OF HEMIOPATHY, FRIENDS CLUB AND OTHERS Scheme Id : APAS/01/107/123/0001
A) Construction of Concrete Road and B.T. and construction of Gutter SH-6 to Gandhi Statue road, ODR-85, Tal-Bhusawal, Dist- Jalgaon. B) Concreting, Gutter, Public Work BT of Gandhi Statue to Railway Boundary, ODR-85, Tal-Bhusawal, Dist- Jalgaon.
B) Gandhi Statue to Railway Boundary
Repairing of Black top Rd from 23/3 UK Dutta Rd to Metro Railway Boundary Wall from 23/5 UK Dutta Rd to Shree Nibas, Mandir Rd in front of Satyen Apt and UK Dutta Rd (Rd restoration of pipeline work)
Repairing of Black top Rd from 23/3 UK Dutta Rd to Metro Railway Boundary Wall from 23/5 UK Dutta Rd to Shree Nibas, Mandir Rd in front of Satyen Apt and UK Dutta Rd (Rd restoration of pipeline work)
Construction of Gram Neemkuhi to Setparas (Up to main Road) Length 1.80 Km.And Jatachaper Railway station approach Road Length 1.00 Km.Total Length 2.80 Km Including electrification work. (Ist-Call)
WORK NO. 05 WARD SANKHYA 45, BIRLA MANDIR, MOHAN NAGAR ME VRINDAVAN MUKHYA MARG SE RAILWAY LINE TAK EVAM KALI MANDIR SE SHRI LAKSHMIKANT SHARMA KE MAKAN V KRISHNAPURAM HOTE HUYE VRINDAVAN MUKHYA MARG TAK INTERLOKING SADAK KA NIRMAN KARYA
Providing, laying spreading & compacting of granular sub base (GSB) by providing close graded (Fr-1) materials, sprading in uniform layers with Mortor Graded on prepared surface, mixing by mix I n placed method with Rotovater at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MoR &H clause 401& as directed by Engineer Incharge including all machine charges & including all labour, T& P etc req for proper completion of work. Analysis rate SOR 2023
NIT 89.9 Work of construction and commissioning of Tubewells and P/L/J of HDPE Pipeline for at east direction of Vijay Nagar Railway Line Village- Benar with daulatpura Sub Div Chomu Distict Jaipur with material and 2 years defect liability period
2.1 Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications, with gravel as per IS:4097-1967 and it s packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it s primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. 2.1.2 Nominal bore 200 mm dia.