Loading…
Loading…
6,179 results • Best match
DRAIN COCK 1/2"TO EASTERN RAILWAY KPA DRG. NO. ER/KPA/EL/AR3 HE 1540A SHEET 1 & 2 ALT. A, ALONGWITH LATEST AMENDMENT/ALTERATION IF ANY. Firm's offer and accepted -DRAIN COCK 1/2" TO EASTERN RAILWAY KP
Supplying and Erection of 25 nos 4.5 mtr steel tubular pole with LED Luminaries for road lighting from Deaf and Dumb School to Uttarpara Railway Station within Polling Station No 96 in Ward No 20 under Uttarpara-Kotrung Municipality under APAS
Double braided hose pipe of length 28 mtr. nominal bore 25 mm working capacity of pipe not less than 20 kg/cm2 with both end brake pipe (BP) palm end suitable for Indian Railway Coach end fittings. Ho
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; SETTING UP OF GRIP CELL RECEPTION DESKS AND LIAISON CELLS AT AIRPORT, RAILWAY STATION AND ENC (O) MESS FOR IFR 26; Venue Development; AIRPORT, RAILWAY STATION AND ENC (O..
RAILWAY STATION AND ENC (O) MESS FOR IFR 26; Venue Development; AIRPORT
METRO RAILWAY GENERAL RULES 2020, SPECIAL INSTRUCTION FOR METRO RAILWAY GENERAL RULES 2020, METRO RAILWAYS OPERATION AND MAINTENANCE ACT 2002, SAFETY MANUALS, TELECOM ENGINEERING MANUAL VER 1.4, SIGNALLING ENGINEERING MANUAL - VER 2.0, EM MANUAL VOL-1, EM MANUAL CHECKLIST VOL-2
METRO RAILWAY GENERAL RULES 2020
Construction of road over bridge at Bethlegam area in Ambur Town at the Road Branching off from Km 68/4 of Krishnagiri Ranipet Road (NH-46) to Asanampattu at Railway Km.182/10-11 Between Ambur and Vaniyambadi Railway Stations.
Construction of Reinforced Earth Wall, Facia Works (left & right) including Earth work excavation for entire approach, necessary ground improvement, Casting of precast facia elements of 180 mm thick in RCC M35 grade concrete as per specifications given including positive connections , joints, fittings, soil reinforcing elements , geostrips, erection of facia and laying of soil reinforcing element, along with necessary insitu concrete works for foundation pad as well as coping and providing Half perforated drain pipes wrapped with Geotextiles and including filter media and filling materials for the entire approaches using quarry fines with material whose effective angle of friction not less than 30 degree behind the wall as needed for necessary drainage arrangement with outlets including transporting from casting yard to site, design and proof checking, Supervision charges and other incidental charges complete as specified /manufacturer's requirement and as per the MORT&H - V revision Specifications 3100, BS 8006 (Latest Version) and the system supplier shall provide performance bond and same shall be valid for atleast 20 years as per MORT&H - V revision Specifications 3108.