Loading…
Loading…
6,272 results • Best match
Timolol Maleate eye drops 0.5%, 5 ml phial. (Product should be available in the approved product list of railway board.)
Description :Timolol Maleate eye drops 0.5%, 5 ml phial. (Product should be available in the approved pro duct list of railway board.) ] Consignee MEDICAL DIRECTOR /GRC, SER West Bengal 800.00 Numbers
Construction of IPB Road and Drain from Govt. PHE to Railway line and other side in Ward 15 MC Palwal
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
MOEI in CPNR building (Gorton castle building and DIB Dormer) under Railway board section, Shimla (H.P). Subwork/Packages: (SH:- Providing services of lift operator for daily operation for 2 Nos passenger lift at Gorton Castle Building AG Office).
Central Public Works Department
Cost of Approaches to Under Bridge, Cost of Height Guage, Harvesting well, Cost of RCC Drain with grating, Cost of RCC Drain without grating, Cost of Road Furniture, Cost of Electrification, Cost of road/Service road
Launching of precast RCC box segments for RUBs/ Limited Height Subways (LHS) of any size and barrel length for single/double line as per approved drawings to the correct alignment and position in electrified / non-electrified sections safeguarding all utilities (SandT cable, power cable, OHE, pipelines etc.) including transportation of box segments from casting yard to site of launching, dismantling of the existing track, removing and stacking of ballast,cutting of formation and approach road below or above bed level, placing of base slabs and Box segments in position, back filling after launching of precast box segment,ballasting and re-laying of track to correct alignment and geometry, packing and further maintenance till allowing non-stop 20 KMPH over the re-laid track,complete in all respect to the satisfaction of Engineer-in-charge.The rate is all inclusive except the cost of RCC Box Segments, Base Slabs and backfill material which shall eitherbe supplied by railway or paid extra under relevant item. Note: Minimum equipment required during block shall be (i) Crawler mounted Hydraulic excavator of min 200 HP and bucket capacity 2.5 cum - 3 numbers and (ii) 3 cranes of adequate boom length suitable (USSOR No. 031150 and 031151)
Shifting of 33KV Line of Ckt 1 and Ckt 2 of new Dhulian 33 11KV Substation by 3Cx400 SQM XLPE UG Cable at LC Gate No 42 located at KM 239 By 8 to 9 between Basudebpur and Dhuliyan Ganga Railway Station for construction of new Railway Underpass under
SBI Clerk Study guide, ACE Banking and Static Awarness, ACE Quant, ACE English, ACE Reasoning, Railway Exam Mathemetics, Railway Exam General Science, ACE Entrance Exam, Decision Making and Problem Solving and Interpersonal Skills, IBPS ClerkPrelims and Mains Exam, SSB Interview, Education Psychology, RRB 2025 Technical and Non Technical
Railway Exam Mathemetics