Loading…
Loading…
6,036 results • Best match
Supply, Installation, Testing and Commissioning of CCTV at CHP Wagon Tippler Area as per the Indian Railway Departments Requirement
Supply, Installation, Testing and Commissioning of CCTV at CHP Wagon Tippler Area as per the Indian Railway Departments Requirement
R/O Kusarna Kripal Railway pulia ke pass to sarju yadav ke ghar ke age kali ji ke mandir mahamaya mandir hote huye railway line mahdeva tak link road k km 1,2,3,4 in PC work
CHIRAKKAL GP-PR NO-76/2025-26-RETARRING WORKS FOR ROAD FROM ANJUKANDI PARAMB VAYANAYI RAMA HOUSE TO RAILWAY LINE
OD356892/2025-2026:Supplying and fixing Name board of size 75cm x45cm made with GI plain sheets 1.25mm thick(class III) fitted with 35x35x5mm MS angle 2Nos. horizontally and 3Nos. vertically to make a frame for strengthening the GI sheet, fitted 2Nos. 40mm GI pipe vertically 1.5m above from ground level and fixing in ceSupplying and fitting name boards of size 75 cm x 45 cm. made with G I plain sheets 1.25 mm thick (class IIII ) fitted with 35 X35 x 4 mm MS angle 2 Nos horizontally and 3 Nos vertically to make a frame for strengthening the G I sheet , fitted 2 Nos. 32 mm GI pipe vertically 90 cm above from ground level and fixing in cement concrete 1: 2: 4 , 30cm X 30cm X 30 cm. including cost and conveyance of all materials all labour charges, fabricating etc. complete.
Desilting of nala from kamdhenu society towards Ellora tower surrounding railway track area nala Sector 11 at Sanpada in Turbhe Ward.
Cleaning of Drain Track along with PCC in the entrance road and Earth Filling at Burrahgarh Railway Siding under Bastacolla Area
Construction work of drain and covered from Western Railway Crossing to Matsya Haat (Shahidwari) in Ward No. 02
eProcurement System Government of Uttar Pradesh Created By: sadhu Saran Created Date/Time: 23-May-2026 04:26 PM Tender Title: Construction work of drain and covered from Western Railway Crossing to Matsya Haat (Shahidwari) in Ward No. 02 Tender ID: 2026_DOLBU_1130395_1