Loading…
Loading…
6,030 results • Best match
Proposed construction work of CC Road from railway underpass to ganesh krishi fram ki or jane wala rasta in ward no 24
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil
Cleaning and repair work for various drain/nalla for preparation of rainy season in MC Thanesar. 1. Railway underpass to gauri shankar mandir via navyug school in ward-6 2. Lal-dwar mandir to railway underpass in ward-6 3. Teliphone exchange to se
Protective Works along the pond in the Populated area at Km. 1 of Katra Railway Feeder Road (ODR) in Distt. Shahjahanpur (Fin Year 2025-26)
Brick masonry work in1:3 cement mortar in foundation & sub-structure complete excluding pointing and plastering as per drawing and technical specifications Clauses
Cleaning and repair work for various drain/nalla for prepration of Rainy season in MC Thanesar. 1. Subhash kabadi to saraswati in ward-3 2. Ram medicose to h/o dharambir in ward-3 3. Lucky communication to railway underpass ward-4 4. Railway unde
Construction of CC road and balance RCC drain work ( Via Milak Lacchi to Maripat railway road) in Village Roza Jalalpur, Greater Noida.
eProcurement System Government of Uttar Pradesh Created By: PRANAV SINGH RATHORE Created Date/Time: 11-May-2026 01:19 PM Tender Title: Construction of CC road and balance RCC drain work ( Via Milak Lacchi to Maripat railway road) in Village Roza Jalalpur, Greater Noida. Tender ID: 2026_GNIDA_1122182_3
WIDENING AND STRENGTHENING WORK OF AONLA RAILWAY POSHAK ROAD (O.D.R.) IN DISTT. BAREILLY FIN. YEAR 2025-26(INCLUDING 05 YEARS OF MAINTENANCE)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Mechanical Means) including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.)