Loading…
Loading…
6,011 results • Best match
Manufacture and supply of Elastic Rail Clip MK-V conforming to RDSO Drg. No. T-5919, with latest alterations. Specification: Indian Railway Standard specification for Elastic Rail Clips (Fifth Revisio
Supply, erection, testing and commissioning with Five year comprehensive maintenance of Ground Mounted On-Grid Solar PV system at Pathargaon LIS Stage 1 and 2 Ta. Chandur Railway, Dist. Amravati.
FOR THE WORK OFSupply, erection, testing and commissioning with Five year comprehensive maintenance of Ground Mounted On-Grid Solar PV system at Pathargaon LIS Stage 1 and 2 Ta. Chandur Railway, Dist. Amravati. (Please Refer "SCHEDULE B" in tender Document for more details of work)
Providing and laying 350 mm Dia RCC NP3 sewer line and DI water supply pipe line including shifting due to construction of railway underpass in ward no.16 M.C. Panipat.
Making House water connection from water supply distribution system with GI pipe including Ferrule (12 mm), bends with safe access to the consumer including excavation and backfilling.
Diversion of 33KV Feeder No.10 and 11 due to Installation of New Silo No 5 and 6 of AB Series and Proposed Railway Line under Power Supply of Gevra Project.
Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle (20mm X 600 mm ), 7/4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. (Details of cost for one Set)
G.T. Road to Talandu Railway Station from 0.00 kmp. to 1.43 km., Widening and Strengthening work under Hooghly Highway Division No.- II in the district of Hooghly. (3rd Call)
Reconstruction work of City Railway Station to Quila Bridge Road in Distt. Bareilly Under the National Clean Air Program in the financial year 2025-26 (With 05 years Maintenance)
Dismentaling of interlocking tiles and stacking of dismentaled tiles at site required for proper completion of the work as directed by E/I.