Loading…
Loading…
403 results • Best match
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Tank Filling scheme for filling 32numbers of MI/ZP tanks of gudavi(Head works consisting of construction of Barrage, in take trough with forebay, Jack well cum pump house, ... house electrical works, ... system, electrical panel, ... pressure distribution ) ... filling scheme works ... on turnkey basis
Survey, Investigation, Design, Supply, Erection, Testing and Commissioning of Tank Filling scheme for filling 32numbers of MI/ZP tanks of gudavi(Head works consisting of construction of Barrage, in take trough with forebay, Jack well cum pump house, vertical turbine pumps coupled to motors, pump house electrical works, necessary valves, delivery pipe, manifold system, electrical panel, soft strater, capacitors, 11KV transformer, 11/0.433 KV sub station, 11 KV power line and 11 KV terminal bay, r
Outsourcing work of erection, testing and commissioning of Additional 2 no. 20 MVA Power Transformers at 66 Kv Sub station Jakopur and Gillan along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Const.Div., Asr
ARC for erection of HT/LT and TC and Maintenance work at Nadiad East & Nadiad West S/dn / anywhere under Kheda District with cost of Nut-Bolt and other low value miscellaneous material required for erection work. under RDSS Scheme
46 D:\E drive\Tech\Tenders\N Procurement\ERECTION HT LT TC\HT LT TC ERECTION RDSS MAY-26\01 NDE & NDW
Outsourcing work of erection, testing and commissioning of Additional 3 no. 20 MVA Power Transformers at 66 Kv Sub station Shehjada Kalan, Sohian and Lakhana along with complete bay equipments on partial turnkey mode under RDSS scheme under GCD, Asr
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor ... Overhead electrical HT/LT ... on EPC Basis ...
Execution of any other work not covered in Schedule G above(Schedule-G of EPC Agreement) and
Request for Proposal for Construction of the Km: 400.169 to Km: 391.898 for 3rd line i.e. the 8.271 Km and the Km: 403.005 to Km: 392.300 for 4th line i.e. the 10.705 Km, total 18.976 Km between Sini and Kandra Junction, complete gauge conversion of ... block section , ... general electrical works, ... ( EPC )